Unele materiale sunt disponibile în engleză. Textul original al anunțului este cel de referință.
ACCORD-CADRE DE MISSION D’OPERATEUR GLOBAL DE COMPENSATION ENVIRONNEMENTALE SUR LES ZONES D’EXTENSION DE LA ZONE D’ACTIVITE LES PINS
Communauté de communes de l'Estuaire
Gironde
30 nov. 2026
20 oct. 2026
Tender file pre-read
Upload the tender file: Tendveo picks out the submission deadline, site visit, minimum turnover, qualifications, technical requirements and contract clauses, each with the sentence of the document it comes from. An automatic reading to check, not legal advice.
To win this one
- The price: Prix observés dans ce département (9 marchés attribués de ce métier) : un quart sous 279 200 €, médiane 350 000 €, trois quarts sous 850 000 € ; montants publiés, souvent des maxima d'accord-cadre.
- The stakes: Enjeu observé : 317 865 € (médiane du métier, 376 marchés), 5 offres attendues (médiane du métier, 259 marchés) ; environ 63 573 € espérés, ordre de grandeur, pas un devis.
- The clock: 9 days: start this week, site visit or questions to the buyer before the end of week one.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- UNIVERS, OKARE Ingénierie won « Avis attribution - Accord-cadre de maîtrise d'oeuvre à marchés subséquents pour l'extension de la zone d'activ » with Communauté d'Agglomération du Cotentin (Calvados) : 750 000 €, 06/11/2026
- AINTEGRA won « Maîtrise d'oeuvre pour l'aménagement de la Zone d'Activité Economique de Pré-Mouchet situé à Bonneville (74130 » with Communauté de Communes de Faucigny-Glières (Haute-Savoie) : 173 925 €, 11 bids, 30/09/2026
- FCL won « Mission d’audit de la gestion de certains domaines d’activités relevant de l’administration communale » with Ville d'Antibes (06) (Alpes-Maritimes) : 67 685 €, 30/09/2026
- TBM ENVIRONNEMENT, SYNERGIS ENVIRONNEMENT won « Accord-cadre à bons de commande pour les études environnementales, missions de maîtrise d'oeuvre et dossiers d » with Conseil Départemental du Morbihan (Morbihan) : 1 400 000 €, 11 bids, 22/09/2026
- SOCOTEC CONSTRUCTION SAS won « Montlhéry (91) - Quartier Mayence - Réhabilitation de la zone technique - Mission de contrôle technique (CT) » with SERVICE D'INFRASTRUCTURE DE LA DÉFENSE ILE-DE-FRANCE (Yvelines) : 60 000 €, 04/11/2026
Across these 5 contracts: median amount €173,925 (5 published) ; median of 11 bids (2 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 30 novembre 2026, in 9 days.
- A single supplier will be selected. All or nothing.
- A single lot: the contract is taken whole or not at all.
- Duration: 60 months (5 ans).
- environmental criteria are scored. That is where a local firm earns points a large group does not.
The notice does not state : the question deadline, the score breakdown (critères renvoyés au règlement de la consultation), the estimated value. These are in the consultation rules inside the tender file.
marchespublics@cc-estuaire.fr 0557940586
How many rivals you actually face
sur les marchés « Etude », la médiane est de 4 offres par lot. 31 % des lots en reçoivent trois ou moins, et seulement 15 % dépassent dix candidats.
94 % des offres viennent de PME.
Stakes: Enjeu observé : 317 865 € (médiane du métier, 376 marchés), 5 offres attendues (médiane du métier, 259 marchés) ; environ 63 573 € espérés, ordre de grandeur, pas un devis.
Measured on 80 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-101194.