construction d’un programme immobilier neuf de 59 logements mixtes, dont pour l’opération « SQUARE PAPAYE »
Société Immobilière de Mayotte (976)
Mayotte
21 lis 2026
23 paź 2026
To win this one
- The score: La technique pèse 50 % contre 50 % au prix. Un bon mémoire passe devant un concurrent moins cher.
- The stakes: Enjeu observé : 524 048 € (médiane du métier, 306 marchés), 3 offres attendues (médiane du métier, 197 marchés) ; environ 174 683 € espérés, ordre de grandeur, pas un devis.
- The clock: 4 days: bid only if your administrative documents are already in hand; a proposal gets finished in that time, not started.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- ENTREPRISE LEON GROSSE won « Marché de Travaux de Réhabilitation de 3 immeubles, 114 logements en site occupé, avenue Kellogg et Square Con » with Hauts-de-Seine Habitat - OPH (Hauts-de-Seine) : 5 490 000 €, 7 bids, 17/11/2026
- BARLET TRAVAUX PUBLICS, JT Constructions won « CONSTRUCTION D'UN POLE DE SANTE PLURIDISCIPLINAIRE ET DE LOGEMENTS DE FONCTION » with Commune des Gets (Haute-Savoie) : 280 000 €, 2 bids, 15/11/2026
- VIANO BTP, PASQUET won « Travaux de construction de 36 logements et d'une maison commune à Châtillon-sur-Indre - "Les Barbarines" » with OPAC 36 (Indre) : 1 655 012 €, 15/09/2026
- EIFFAGE ROUTE NORD EST, MAISON PARISOT won « Accord-cadre à bons de commande - Exécution des travaux non programmés de réparation sur le patrimoine immobil » with Région Grand Est (Aube) : 1 600 000 €, 8 bids, 07/10/2026
- SMABTP, Société mutuelle d’assurance du bâtiment et des travaux publics won « Souscription d’assurances construction pour les opérations de construction de la piscine Bougainville et les t » with ETAB PUBLIC AMENAGEMENT EUROMEDITERRA (Bouches-du-Rhône) : 173 624 €, 08/10/2026
Across these 5 contracts: median amount €1,600,000 (5 published) ; median of 7 bids (3 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 21 novembre 2026, in 4 days.
- Confirm the submission time or time zone on the buyer's platform.
- A single lot: the contract is taken whole or not at all.
- La technique pèse 50 % contre 50 % au prix. Un bon mémoire passe devant un concurrent moins cher.
- Duration: 25 months.
The notice does not state : the question deadline, the estimated value. These are in the consultation rules inside the tender file.
mboinahamissi@sim-mayotte.com +33 269611113
How this buyer will score
La technique pèse 50 % contre 50 % au prix. Un bon mémoire passe devant un concurrent moins cher.
- 50% PRIX
- 50% VALEUR TECHNIQUE o Principes de collaboration envisagés durant la phase de…co-construction : 10 % ; o Méthodologie pour réaliser le chantier : 15% o Démarche qualité et ambitions environnementales : 10% o Organisation du chantier et moyens
How many rivals you actually face
sur les marchés « Bâtiment », la médiane est de 4 offres par lot. 34 % des lots en reçoivent trois ou moins, et seulement 6 % dépassent dix candidats.
87 % des offres viennent de PME.
Stakes: Enjeu observé : 524 048 € (médiane du métier, 306 marchés), 3 offres attendues (médiane du métier, 197 marchés) ; environ 174 683 € espérés, ordre de grandeur, pas un devis.
Measured on 253 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-102759.