Unele materiale sunt disponibile în engleză. Textul original al anunțului este cel de referință.
ÉLABORATION ET RÉALISATION D'INTERVENTIONS SCOLAIRES D'ÉDUCATION À L'ENVIRONNEMENT ET AU DÉVELOPPEMENT DURABLE SUR LE TERRITOIRE DE LA COMMUNAUTÉ DE COMMUNES SUD VENDÉE LITTORAL - 3 lots
Communauté de Communes Sud Vendée Littoral
Vendée
23 nov. 2026
22 oct. 2026
Bid file for one lot: lot 1 lot 2 lot 3
Technical proposal per lot (one draft per lot): Proposal for lot 1 Proposal for lot 2 Proposal for lot 3
Tender file pre-read
Upload the tender file: Tendveo picks out the submission deadline, site visit, minimum turnover, qualifications, technical requirements and contract clauses, each with the sentence of the document it comes from. An automatic reading to check, not legal advice.
To win this one
- The stakes: Enjeu observé : 249 370 € (médiane du métier, 86 marchés), 4 offres attendues (médiane du métier, 60 marchés) ; environ 62 343 € espérés, ordre de grandeur, pas un devis.
- The clock: 3 days: bid only if your administrative documents are already in hand; a proposal gets finished in that time, not started.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- CPIE CHABLAIS LEMAN, FRANCE NATURE ENVIRONNEMENT HAUTE-SAVOIE won « Education à l'environnement - Conception et réalisation d'animations pour les écoles autour de quatre piliers » with THONON AGGLOMERATION (Haute-Savoie) : 155 000 €, 4 bids, 29/09/2026
Across these 1 contracts: median amount €155,000 (1 published) ; median of 4 bids (1 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 23 novembre 2026, in 3 days.
- The contract is split into 3 lots. You may bid on the one that fits you only.
- Duration: 43 months.
- environmental criteria are scored. That is where a local firm earns points a large group does not.
The notice does not state : the question deadline, the score breakdown (critères publiés en texte libre : les poids lus font 104 et non 100 (« L'offre économiquement la plus avantageuse sera appréciée dans les conditions prévues aux articles L.2152-1 à L.2152-4, »)), the estimated value. These are in the consultation rules inside the tender file.
marchespublics@sudvendeelittoral.fr +33 251976464
How many rivals you actually face
sur les marchés « Prestations de services », la médiane est de 3 offres par lot. 61 % des lots en reçoivent trois ou moins, et seulement 7 % dépassent dix candidats.
80 % des offres viennent de PME.
Stakes: Enjeu observé : 249 370 € (médiane du métier, 86 marchés), 4 offres attendues (médiane du métier, 60 marchés) ; environ 62 343 € espérés, ordre de grandeur, pas un devis.
Measured on 335 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-102784.