Alcuni contenuti sono disponibili in inglese. Fa fede il testo originale dell’avviso.
Assistance à maîtrise d'ouvrage (Amo) pour l'aide à la rédaction du cahier des charges pour le lancement d'une consultation d'étude pré-opérationnelle de requalification de l'espac
Commune De Deols
Indre
27 nov 2026
22 ott 2026
Tender file pre-read
Upload the tender file: Tendveo picks out the submission deadline, site visit, minimum turnover, qualifications, technical requirements and contract clauses, each with the sentence of the document it comes from. An automatic reading to check, not legal advice.
To win this one
- The price: Ordre de grandeur du métier en France (376 marchés attribués de ce métier) : un quart sous 153 543 €, médiane 317 865 €, trois quarts sous 740 267 € ; montants publiés, souvent des maxima d'accord-cadre.
- The stakes: Enjeu observé : 317 865 € (médiane du métier, 376 marchés), 5 offres attendues (médiane du métier, 259 marchés) ; environ 63 573 € espérés, ordre de grandeur, pas un devis.
- The clock: 7 days: bid only if your administrative documents are already in hand; a proposal gets finished in that time, not started.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- GROUPEMENT CLENET BROSSET BNR ARCHITECTES, GROUPEMENT VILLES VIVANTES won « Assistance à maîtrise d'ouvrage pour des études pré-opérationnelles dans le domaine de l'urbanisme et du fonci » with Région Bretagne (Ille-et-Vilaine) : 3 bids, 18/11/2026
- ANTEA FRANCE won « Etudes de faisabilité, programmation et assistance pour le lancement d'un marché de maitrise d'oeuvre pour des » with Saint-Nazaire Agglomération - la CARENE (Loire-Atlantique) : 39 199 €, 5 bids, 11/11/2026
- PRAXYS, ATELIER MA won « Etudes pré-opérationnelles en vue de l'aménagement de l'Arc Ouest » with Mairie de Calais (Pas-de-Calais) : 18/11/2026
- SCET won « Assistance à maitrise d'ouvrage » with CAISSE DES DEPOTS ET CONSIGNATIONS (Paris) : 4 100 000 €, 31/10/2026
- ALTEREA won « Assistance à Maîtrise d'ouvrage » with CCI DROME (Drôme) : 132 113 €, 11 bids, 01/10/2026
Across these 5 contracts: median amount €132,113 (3 published) ; median of 5 bids (3 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 27 novembre 2026, in 7 days.
- Duration: 6 months.
- environmental criteria are scored. That is where a local firm earns points a large group does not.
The notice does not state : the question deadline, the score breakdown (critères renvoyés au règlement de la consultation (« énoncé dans le Rc »)), the estimated value. These are in the consultation rules inside the tender file.
+33 254345866
How many rivals you actually face
sur les marchés « Assistance à maîtrise d'ouvrage », la médiane est de 6 offres par lot. 23 % des lots en reçoivent trois ou moins, et seulement 23 % dépassent dix candidats.
60 % des offres viennent de PME.
Stakes: Enjeu observé : 317 865 € (médiane du métier, 376 marchés), 5 offres attendues (médiane du métier, 259 marchés) ; environ 63 573 € espérés, ordre de grandeur, pas un devis.
Measured on 35 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-102834.