Alcuni contenuti sono disponibili in inglese. Fa fede il testo originale dell’avviso.
Travaux d'extension et de restructuration des sanitaires, de l'administration et de l'infirmerie au collège Jean Renoir à BOURGES
Conseil Départemental du Cher
Cher
08 gen 2027
25 ott 2026
Bid file for one lot: lot 1 lot 2 lot 3 lot 4 lot 5 lot 6 lot 7 lot 8 lot 9 lot 10 lot 11 lot 12
To win this one
- The stakes: Enjeu observé : 524 048 € (médiane du métier, 306 marchés), 3 offres attendues (médiane du métier, 197 marchés) ; environ 174 683 € espérés, ordre de grandeur, pas un devis.
- The clock: 52 days: time to question the buyer, visit, and write a tailored proposal.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- LOCACONCEPT SAS won « FOURNITURE ET LOCATION DE MODULES PROVISOIRES POUR LES TRAVAUX DE RESTRUCTURATION DES CUISINES DU COLLÈGE JEAN » with Département des Landes (Landes) : 418 293 €, 08/11/2026
- SARL LARUE BRUNO won « RESTRUCTURATION GLOBALE AVEC EXTENSION AU COLLEGE RENE CASSIN A PARAY-LE-MONIAL » with DEPARTEMENT DE SAONE ET LOIRE (Saône-et-Loire) : 1 442 501 €, 29/10/2026
- PRO AMIANTE, THOMAS ET FILS won « RESTRUCTURATION GLOBALE AVEC EXTENSION AU COLLEGE RENE CASSIN A PARAY-LE-MONIAL » with DEPARTEMENT DE SAONE ET LOIRE (Saône-et-Loire) : 115 295 €, 15/09/2026
- CHOLET TP SAS, SASU ID VERDE won « Travaux de restructuration du collège Joachim du Bellay à Cholet » with DEPARTEMENT DU MAINE ET LOIRE (Maine-et-Loire) : 253 981 €, 08/11/2026
- GROUPEMENT BC AUVERGNE RHONE ALPES (mandataire) / BAUDIN CHATEAUNEUF, GENEVRIER MENUISERIE won « Réhabilitation et extension du bâtiment Sainte Anne (pôle Pays de Gex) sur le site de la Madeleine à Bourg-en- » with Département de l'Ain (Ain) : 4 069 610 €, 2 bids, 27/09/2026
Across these 5 contracts: median amount €418,293 (5 published) ; median of 2 bids (1 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 8 janvier 2027, in 52 days.
- The contract is split into 12 lots, and one candidate may win at most 12. You may bid on the one that fits you only.
- Duration: 16 months.
- environmental criteria are scored. That is where a local firm earns points a large group does not.
- Variants are allowed: you may propose your own solution alongside the requested one.
- Performance starts on 1er avril 2027.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution), the estimated value. These are in the consultation rules inside the tender file.
nathalie.parry@departement18.fr 0248278151
How many rivals you actually face
sur les marchés « Charpente », la médiane est de 2 offres par lot. 77 % des lots en reçoivent trois ou moins, et seulement 0 % dépassent dix candidats.
Stakes: Enjeu observé : 524 048 € (médiane du métier, 306 marchés), 3 offres attendues (médiane du métier, 197 marchés) ; environ 174 683 € espérés, ordre de grandeur, pas un devis.
Measured on 22 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-103236.