Accord-cadre de travaux de câblage et installations électriques
Semitan
Loire-Atlantique
25 nov 2026
29 oct 2026
Tender file pre-read
Upload the tender file: Tendveo picks out the submission deadline, site visit, minimum turnover, qualifications, technical requirements and contract clauses, each with the sentence of the document it comes from. An automatic reading to check, not legal advice.
To win this one
- The stakes: Enjeu observé : 639 681 € (médiane du métier, 175 marchés), 3 offres attendues (médiane du métier, 120 marchés) ; environ 213 227 € espérés, ordre de grandeur, pas un devis.
- The clock: 6 days: bid only if your administrative documents are already in hand; a proposal gets finished in that time, not started.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- SOCOTEC EQUIPEMENTS SAS won « Contrôles réglementaires des installations électriques » with NOREADE SIDEN-SIAN (Nord) : 29/10/2026
- SOVEC ENTREPRISES won « Maintenance des installations électriques à l'Hôtel d'Alsace Strasbourg » with Collectivité européenne d Alsace (Bas-Rhin) : 144 000 €, 30/10/2026
- INEO AQUITAINE, FAUCHE won « Exploitation et maintenance des installations électriques » with UNIVERSITE DE BORDEAUX (Dordogne) : 06/10/2026
- SPIE CITYNETWORKS, CEPECA won « Fourniture, installation et mise en service d'infrastructures de charge pour véhicules électriques en Nouvelle » with Territoire d'Energie Lot-et-Garonne (Lot-et-Garonne) : 682 218 €, 7 bids, 19/11/2026
- GARCZYNSKI TRAPLOIR, SYGMATEL won « Travaux d'entretien et de maintenance sur l'ensemble des installations électriques du patrimoine du Départemen » with Département de la Sarthe (Sarthe) : 6 400 000 €, 4 bids, 21/10/2026
Across these 5 contracts: median amount €682,218 (3 published) ; median of 5.5 bids (2 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 25 novembre 2026, in 6 days.
- Duration: 12 months.
- environmental criteria are scored. That is where a local firm earns points a large group does not.
The notice does not state : the question deadline, the score breakdown (critères renvoyés au règlement de la consultation (« énoncé dans le Rc »)), the estimated value. These are in the consultation rules inside the tender file.
+33 251817700
How many rivals you actually face
sur les marchés « Electricité (travaux) », la médiane est de 5 offres par lot. 29 % des lots en reçoivent trois ou moins, et seulement 9 % dépassent dix candidats.
85 % des offres viennent de PME.
With this buyer: This buyer received a median of 5 bid(s) on its latest contracts, all trades (5 contracts where the number is published). At the latest contract the holder changed: this buyer does not renew by default. Awarded amounts: median €1,333,081 (5 contracts, from €650,000 to €12,000,000).
Stakes: Enjeu observé : 639 681 € (médiane du métier, 175 marchés), 3 offres attendues (médiane du métier, 120 marchés) ; environ 213 227 € espérés, ordre de grandeur, pas un devis.
Measured on 116 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-105200.