Alcuni contenuti sono disponibili in inglese. Fa fede il testo originale dell’avviso.

Électricité & génie climatiqueData da verificareProcédure adaptée (attribution possible sans négociation)

Mise en souterrain de la ligne Hta entre les postes Dzoumogné village 06001 et Maternité Nord 06007

Buyer

Edm électricité de Mayotte

Location

Mayotte

Deadline

01 dic 2026

Published

29 ott 2026

Open the notice & tender file ↗ Read the expert study (in French) Check my price Download the bid file (ZIP, in French)

Tender file pre-read

Upload the tender file: Tendveo picks out the submission deadline, site visit, minimum turnover, qualifications, technical requirements and contract clauses, each with the sentence of the document it comes from. An automatic reading to check, not legal advice.

Create your radar to upload a tender file →

To win this one

  • The score: Le prix pèse 60 %, la technique 40 %. Il faut les deux : un prix serré ET un mémoire qui ne perd pas de points. (Pondération lue dans le texte libre de l'avis : à confirmer dans le règlement de la consultation.)
  • The stakes: Enjeu observé : 639 681 € (médiane du métier, 169 marchés), 3 offres attendues (médiane du métier, 117 marchés) ; environ 213 227 € espérés, ordre de grandeur, pas un devis.
  • The clock: 12 days: start this week, site visit or questions to the buyer before the end of week one.

Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.

Who won similar contracts

  • SEMERU won « Maintenance des postes de livraison électrique des établissements de la Direction Régionale Nord Filieris » with FILIERIS (Pas-de-Calais) : 440 000 €, 22/10/2026

Across these 1 contracts: median amount €440,000 (1 published).

Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.

The essentials, in thirty seconds

Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.

  • Bids due on 1er décembre 2026, in 12 days.
  • Confirm the submission time or time zone on the buyer's platform.
  • Le prix pèse 60 %, la technique 40 %. Il faut les deux : un prix serré ET un mémoire qui ne perd pas de points. (Pondération lue dans le texte libre de l'avis : à confirmer dans le règlement de la consultation.)
  • Duration: 6 months.
  • environmental criteria are scored. That is where a local firm earns points a large group does not.

The notice does not state : the question deadline, the estimated value. These are in the consultation rules inside the tender file.

Ask the buyer a question

+33 269639500

Open the tender file

How this buyer will score

Le prix pèse 60 %, la technique 40 %. Il faut les deux : un prix serré ET un mémoire qui ne perd pas de points. (Pondération lue dans le texte libre de l'avis : à confirmer dans le règlement de la consultation.)

Quality 40%Price 60%
  • 40% Valeur technique
  • 60% Prix
Prepare my technical proposal →

How many rivals you actually face

sur les marchés « Electricité (travaux) », la médiane est de 5 offres par lot. 30 % des lots en reçoivent trois ou moins, et seulement 9 % dépassent dix candidats.

5bids per lot, median
7%of lots get a single bidder
30%of lots get 3 bidders or fewer

93 % des offres viennent de PME.

Stakes: Enjeu observé : 639 681 € (médiane du métier, 169 marchés), 3 offres attendues (médiane du métier, 117 marchés) ; environ 213 227 € espérés, ordre de grandeur, pas un devis.

Measured on 112 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.

Run your radar to see how well this contract fits you, and get the next ones automatically. Descrivi la mia attività →

Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-105420.