Études & maîtrise d'œuvredentro de 17 díasProcédure Ouverte

Mission de maîtrise d'oeuvre pour la création d'une unité de traitement des nitrates et pesticides sur la station de pompage d'Harly

Buyer

CA du Saint-Quentinois

Location

Aisne

Deadline

07 dic 2026

dentro de 17 días
Published

04 nov 2026

Open the notice & tender file ↗ Read the expert study (in French) Check my price Download the bid file (ZIP, in French)

Tender file pre-read

Upload the tender file: Tendveo picks out the submission deadline, site visit, minimum turnover, qualifications, technical requirements and contract clauses, each with the sentence of the document it comes from. An automatic reading to check, not legal advice.

Create your radar to upload a tender file →

To win this one

  • The score: La technique pèse 60 % contre 40 % au prix. Un bon mémoire passe devant un concurrent moins cher.
  • The price: Ordre de grandeur du métier en France (376 marchés attribués de ce métier) : un quart sous 153 543 €, médiane 317 865 €, trois quarts sous 740 267 € ; montants publiés, souvent des maxima d'accord-cadre.
  • The stakes: Enjeu observé : 317 865 € (médiane du métier, 376 marchés), 5 offres attendues (médiane du métier, 259 marchés) ; environ 63 573 € espérés, ordre de grandeur, pas un devis.
  • The clock: 17 days: start this week, site visit or questions to the buyer before the end of week one.

Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.

Who won similar contracts

  • AD QUATIO, RICHTER ARCHITECTES ET ASSOCIES won « CONCOURS OUVERT : CREATION DE TROIS UNITES D'HOSPITALISATION TEMPS PLEIN (UHTP) » with Etablissement public de santé Barthélémy-Durand (Essonne) : 3 bids, 19/11/2026
  • IRH INGENIEUR CONSEIL won « MISSION DE MAITRISE D'OEUVRE POUR LA RECONSTRUCTION DE LA STATION D'EPURATION DE PRECY-SUR-MARNE/CHARMENTRAY » with Communauté de communes Plaines et Monts de France (Seine-et-Marne) : 192 328 €, 7 bids, 05/11/2026
  • ATELIERS O-S ARCHITECTES won « Concours de maîtrise d’oeuvre sur " esquisse + " pour la création d’une nouvelle cuisine centrale. » with COMMUNE DE LAON (Aisne) : 503 750 €, 15/11/2026
  • ATELIER MLH, PARICA INTERNATIONAL won « ACCORD CADRE POUR LA MISSION DE MAITRISE D'OEUVRE POUR LES TRAVAUX DE REHABILITATIONS ET D'AMENAGEMENTS » with ETBT du Château de Versailles (Yvelines) : 18/10/2026
  • MICHEL DESVIGNE PAYSAGISTE, VERDI NORD DE FRANCE won « Mission de maîtrise d'oeuvre et missions complémentaires pour la requalification de l'avenue Jean Lebas à Roub » with Métropole Européenne de Lille (Nord) : 618 000 €, 23/10/2026

Across these 5 contracts: median amount €503,750 (3 published) ; median of 5 bids (2 published).

Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.

The essentials, in thirty seconds

Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.

  • Bids due on 7 décembre 2026, in 17 days.
  • A single lot: the contract is taken whole or not at all.
  • La technique pèse 60 % contre 40 % au prix. Un bon mémoire passe devant un concurrent moins cher.
  • Duration: 48 months (4 ans).
  • social and environmental criteria are scored. That is where a local firm earns points a large group does not.
  • Performance starts on 8 février 2027.

The notice does not state : the question deadline, the estimated value. These are in the consultation rules inside the tender file.

Ask the buyer a question

marchespublics.agglo@casq.fr 0323069133

Open the tender file

How this buyer will score

La technique pèse 60 % contre 40 % au prix. Un bon mémoire passe devant un concurrent moins cher.

Quality 60%Price 40%
  • 60pts Valeur technique
  • 5pts Performances en matière de protection de l'environnement et optimisation du coût… (typed as quality by the buyer, but its label names price)
  • 35pts Prix des prestations
Prepare my technical proposal →

How many rivals you actually face

sur les marchés « Maîtrise d'oeuvre », la médiane est de 5 offres par lot. 38 % des lots en reçoivent trois ou moins, et seulement 26 % dépassent dix candidats.

5bids per lot, median
5%of lots get a single bidder
38%of lots get 3 bidders or fewer

77 % des offres viennent de PME, et dans 21 % des lots aucune PME n'a candidaté.

Stakes: Enjeu observé : 317 865 € (médiane du métier, 376 marchés), 5 offres attendues (médiane du métier, 259 marchés) ; environ 63 573 € espérés, ordre de grandeur, pas un devis.

Measured on 84 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.