Alcuni contenuti sono disponibili in inglese. Fa fede il testo originale dell’avviso.
Marché de maitrise d'oeuvre pour la mise en conformité du service Sspi adultes et enfants - Chu Site Félix Guyon
Chu Sud Réunion
La Réunion
04 dic 2026
04 nov 2026
Tender file pre-read
Upload the tender file: Tendveo picks out the submission deadline, site visit, minimum turnover, qualifications, technical requirements and contract clauses, each with the sentence of the document it comes from. An automatic reading to check, not legal advice.
To win this one
- The price: Prix observés dans ce département (9 marchés attribués de ce métier) : un quart sous 78 125 €, médiane 214 900 €, trois quarts sous 393 158 € ; montants publiés, souvent des maxima d'accord-cadre.
- The stakes: Enjeu observé : 317 865 € (médiane du métier, 376 marchés), 5 offres attendues (médiane du métier, 259 marchés) ; environ 63 573 € espérés, ordre de grandeur, pas un devis.
- The clock: 14 days: start this week, site visit or questions to the buyer before the end of week one.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- ARMOR INGENIERIE, ADA ARCHITECTURE won « Mission de maîtrise d'oeuvre pour les travaux de mise en conformité désenfumage Bloc Hôpital » with 35 CHU (Ille-et-Vilaine) : 380 250 €, 22/10/2026
- RSHP won « CHU Brest - La Cavale Blanche - Marché de maîtrise d'oeuvre - Restructuration et extension du plateau techniqu » with 29 CHRU (Finistère) : 14 837 121 €, 13/10/2026
- BLAQ ARCHITECTURES won « Maîtrise d'oeuvre pour des travaux de réhabilitation du site de Creil » with CAISSE D ALLOCATIONS FAMILIALES (Oise) : 282 880 €, 04/10/2026
- ABO-ERG ENVIRONNEMENT won « Missions de maîtrise d'oeuvre pour les travaux de dépollution du site DUCLOS à Septèmes-Les-Vallons (13) » with Etablissement public foncier PACA (Bouches-du-Rhône) : 288 800 €, 5 bids, 15/10/2026
- Studio Arch won « Concours restreint de maitrise d'oeuvre pour la construction d'une halle de sport sur le site des Grandes Comb » with Mairie de Courchevel (Savoie) : 3 bids, 25/10/2026
Across these 5 contracts: median amount €334,525 (4 published) ; median of 4 bids (2 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 4 décembre 2026, in 14 days.
- Confirm the submission time or time zone on the buyer's platform.
- Duration: 6 months.
- social and environmental criteria are scored. That is where a local firm earns points a large group does not.
The notice does not state : the question deadline, the score breakdown (critères renvoyés au règlement de la consultation (« énoncé dans le Rc »)), the estimated value. These are in the consultation rules inside the tender file.
+33 262359045
How many rivals you actually face
sur les marchés « Maîtrise d'oeuvre », la médiane est de 5 offres par lot. 38 % des lots en reçoivent trois ou moins, et seulement 26 % dépassent dix candidats.
77 % des offres viennent de PME, et dans 21 % des lots aucune PME n'a candidaté.
Stakes: Enjeu observé : 317 865 € (médiane du métier, 376 marchés), 5 offres attendues (médiane du métier, 259 marchés) ; environ 63 573 € espérés, ordre de grandeur, pas un devis.
Measured on 84 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-107294.