MARCHE GENIE CIVIL VRD Création d'une chaufferie biomasse et d'un réseau de chaleur
ENES Hombourg Haut
Moselle
04 dec 2026
05 nov 2026
To win this one
- The stakes: Enjeu observé : 765 637 € (médiane du métier, 145 marchés), 3 offres attendues (médiane du métier, 80 marchés) ; environ 255 212 € espérés, ordre de grandeur, pas un devis.
- The clock: 17 days: start this week, site visit or questions to the buyer before the end of week one.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- Groupement COLAS France - Établissement de Lyon Métropole (mandataire) AXIMUM - Établissement mobilité Rhin / Rhône Alpe won « ACCORD-CADRE DE TRAVAUX VRD - GENIE CIVIL ET INFRASTRUCTURES » with INSTITUT NATIONAL DES SCIENCES APPLIQUEES (INSA) DE LYON (Ain) : 5 000 000 €, 31/10/2026
- REYNALD ANDRE, INSTALLATION MATERIEL TELEPHONIQUE won « Accord cadre travaux de génie civil en domaine privé de raccordement à la fibre optique » with Syndicat Mixte Gers Numérique (Gers) : 5 bids, 02/10/2026
- GEOCADRE won « Prestation d'études géotechniques » with Commune de Pontault-Combault (Seine-et-Marne) : 240 000 €, 25/10/2026
- Bouygues Travaux Publics Régions won « Remise à niveau des ouvrages de l’échangeur A7-A557 sur l’A557 à Marseille (13) » with DIRMED (Bouches-du-Rhône) : 5 577 000 €, 13/09/2026
- NGE GENIE CIVIL won « RD900-RD914 - Requalification entre le giratoire de Mailloles et le giratoire du Mas Rouma - OA2 et OA2bis » with CONSEIL DEPARTEMENTAL DES PYRENEES-ORIENTALES (Pyrénées-Orientales) : 1 722 770 €, 3 bids, 18/10/2026
Across these 5 contracts: median amount €3,361,385 (4 published) ; median of 4 bids (2 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 4 décembre 2026, in 17 days.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution), the contract duration, the estimated value. These are in the consultation rules inside the tender file.
a.bader@rmec.fr +33 387293944
How many rivals you actually face
sur les marchés « Gros oeuvre », la médiane est de 6 offres par lot. 24 % des lots en reçoivent trois ou moins, et seulement 34 % dépassent dix candidats.
Stakes: Enjeu observé : 765 637 € (médiane du métier, 145 marchés), 3 offres attendues (médiane du métier, 80 marchés) ; environ 255 212 € espérés, ordre de grandeur, pas un devis.
Measured on 41 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.