Unele materiale sunt disponibile în engleză. Textul original al anunțului este cel de referință.
Travaux de reconstruction de Farés Post CHIDO au collège de Kani keli
RECT- 976
Mayotte
20 nov. 2026
06 nov. 2026
Bid file for one lot: lot 1 lot 2 lot 3 lot 4 lot 5 lot 6 lot 7 lot 8
To win this one
- The stakes: Enjeu observé : 524 048 € (médiane du métier, 306 marchés), 3 offres attendues (médiane du métier, 197 marchés) ; environ 174 683 € espérés, ordre de grandeur, pas un devis.
- The clock: 3 days: bid only if your administrative documents are already in hand; a proposal gets finished in that time, not started.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- EIFFAGE CONSTRUCTION NORD PAS DE CALAIS, SUEUR won « Travaux de reconstruction du groupe scolaire Condorcet à Boulogne-sur-Mer » with MAIRIE DE BOULOGNE SUR MER (Pas-de-Calais) : 2 720 000 €, 2 bids, 04/11/2026
- SADE CGTH won « Travaux de reconstruction et de réhabilitation du collecteur unitaire "Le Napoléonien" à Rambouillet - Phase c » with CA Rambouillet Territoires (Yvelines) : 7 151 567 €, 22/10/2026
- CHOLET TP SAS, SASU ID VERDE won « Travaux de restructuration du collège Joachim du Bellay à Cholet » with DEPARTEMENT DU MAINE ET LOIRE (Maine-et-Loire) : 253 981 €, 08/11/2026
- STPA - Etablissement de LHOTELLIER Travaux Publics, G3D DEMOLITION won « Travaux de construction du collège Charles Bignon à Oisemont » with Conseil Départemental de la Somme (Somme) : 1 779 628 €, 4 bids, 05/11/2026
- DANIEL TP, MARSE CONSTRUCTION won « TRAVAUX DE RENOVATION ENERGETIQUE ET DE MISE EN ACCESSIBILITE DU COLLEGE CLOTILDE VAUTIER A RENNES » with SPL CONSTRUCTION PUBLIQUE D’ILLE-ET-VILAINE (Ille-et-Vilaine) : 459 573 €, 17/11/2026
Across these 5 contracts: median amount €1,779,628 (5 published) ; median of 3 bids (2 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 20 novembre 2026, in 3 days.
- Confirm the submission time or time zone on the buyer's platform.
- The contract is split into 8 lots. You may bid on the one that fits you only.
- Duration: 36 months (3 ans).
- Estimated value: 700 000 €.
- environmental criteria are scored. That is where a local firm earns points a large group does not.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution). These are in the consultation rules inside the tender file.
How many rivals you actually face
sur les marchés « Bâtiment », la médiane est de 4 offres par lot. 34 % des lots en reçoivent trois ou moins, et seulement 6 % dépassent dix candidats.
87 % des offres viennent de PME.
Stakes: Enjeu observé : 524 048 € (médiane du métier, 306 marchés), 3 offres attendues (médiane du métier, 197 marchés) ; environ 174 683 € espérés, ordre de grandeur, pas un devis.
Measured on 253 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-108386.