Niektóre treści są dostępne po angielsku. Wiążący jest oryginalny tekst ogłoszenia.
Maintenance préventive et curative des infrastructures de recharge pour véhicules électriques (IRVE) du réseau MODULO
MODULO (MOBILITE DURABLE LOCALE)
Indre-et-Loire
23 gru 2026
19 lis 2026
Tender file pre-read
Upload the tender file: Tendveo picks out the submission deadline, site visit, minimum turnover, qualifications, technical requirements and contract clauses, each with the sentence of the document it comes from. An automatic reading to check, not legal advice.
To win this one
- The stakes: Enjeu observé : 639 681 € (médiane du métier, 175 marchés), 3 offres attendues (médiane du métier, 120 marchés) ; environ 213 227 € espérés, ordre de grandeur, pas un devis.
- The clock: 34 days: time to question the buyer, visit, and write a tailored proposal.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- E-TOTEM SAS won « Acquisition et livraison de bornes de recharge pour véhicules électriques » with Communauté d'Agglomération de Béthune-Bruay, Artois Lys Romane (Pas-de-Calais) : 525 977 €, 04/10/2026
- BOUYGUES ENERGIES & SERVICES, EIFFAGE ENERGIE SYSTEMES - MAINE BRETAGNE won « Accord-cadre à bons de commandes études et travaux de réseaux électriques et réseaux annexes 2027-2030 » with SDE35 (Ille-et-Vilaine) : 12 000 000 €, 10 bids, 11/10/2026
- WEX EUROPE SERVICES SAS won « Fourniture de cartes accréditives pour l'approvisionnement en carburants à la pompe, en recharges électriques » with Commune d'Osny (Val-d'Oise) : 25/10/2026
- IMPACT, TOTAL MARKETING FRANCE won « Achat de carburants à la pompe ainsi que recharge des véhicules électriques, par cartes accréditives, destinés » with Département de l'Isère (Isère) : 351 000 €, 4 bids, 05/11/2026
- CEFF won « Travaux de maintenance électrique des infrastructures maritimes et fluviales » with Département de la Seine-Maritime (Seine-Maritime) : 2 800 000 €, 3 bids, 29/10/2026
Across these 5 contracts: median amount €1,662,989 (4 published) ; median of 4 bids (3 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 23 décembre 2026, in 34 days.
- Up to 100 suppliers may be selected: first place is not the only one that counts, but the number actually selected depends on the bids received and the rules.
- A single lot: the contract is taken whole or not at all.
- Duration: 24 months (2 ans), renewable.
- Estimated value: 3 300 000 €.
- Performance starts on 1er mars 2027.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution). These are in the consultation rules inside the tender file.
contact@modulo-energies.fr +33 247310915
How many rivals you actually face
sur les marchés « Electricité (travaux) », la médiane est de 5 offres par lot. 29 % des lots en reçoivent trois ou moins, et seulement 9 % dépassent dix candidats.
85 % des offres viennent de PME.
Stakes: Enjeu observé : 639 681 € (médiane du métier, 175 marchés), 3 offres attendues (médiane du métier, 120 marchés) ; environ 213 227 € espérés, ordre de grandeur, pas un devis.
Measured on 116 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-111734.