Sommige inhoud is beschikbaar in het Engels. De oorspronkelijke bekendmaking is leidend.
Mission de mandat d’études, Requalification de la ZAE de Jarry
Cap Excellence (971)
Guadeloupe
14 dec 2026
20 nov 2026
Tender file pre-read
Upload the tender file: Tendveo picks out the submission deadline, site visit, minimum turnover, qualifications, technical requirements and contract clauses, each with the sentence of the document it comes from. An automatic reading to check, not legal advice.
To win this one
- The price: Ordre de grandeur du métier en France (364 marchés attribués de ce métier) : un quart sous 151 800 €, médiane 313 324 €, trois quarts sous 749 213 € ; montants publiés, souvent des maxima d'accord-cadre.
- The stakes: Enjeu observé : 313 324 € (médiane du métier, 364 marchés), 5 offres attendues (médiane du métier, 249 marchés) ; environ 62 665 € espérés, ordre de grandeur, pas un devis.
- The clock: 23 days: time to question the buyer, visit, and write a tailored proposal.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- SARL VIALIS INGENIERIE won « Mission MOE pour la Requalification de la rue Saint-Charles à Sainte-Rose » with Société d'Economie Mixte d'Aménagement des Antilles Guyane (Guadeloupe) : 50 400 €, 4 bids, 18/10/2026
- Groupement INGETEC (Mandataire) / Laboratoire d’écologie urbaine de la Réunion / Laboratoire Architecture bioclimatique won « 26DTP032 - Mission de maîtrise d'oeuvre dans le cadre de l'aménagement d'une ZAE et d'une déchèterie à la Sali » with Communauté d'Agglomération Territoire de la Côte Ouest (974) (La Réunion) : 393 158 €, 23/09/2026
- MICHEL DESVIGNE PAYSAGISTE, VERDI NORD DE FRANCE won « Mission de maîtrise d'oeuvre et missions complémentaires pour la requalification de l'avenue Jean Lebas à Roub » with Métropole Européenne de Lille (Nord) : 618 000 €, 23/10/2026
- ARTELIA SAS, EGIS EAU SA won « ACCORDS-CADRES MULTI-ATTRIBUTAIRES RELATIFS AUX MISSIONS D'ETUDES ET MAITRISE D'OEUVRE POUR LE CONFORTEMENT ET » with Ville d'ANNECY (Haute-Savoie) : 800 000 €, 8 bids, 04/11/2026
- GROUPEMENT ROUGERIE + TANGRAM/ CERRETTI/ REVERDIE / EDICTIS won « Accord-cadre mixte de coordination et de maitrise d'oeuvre urbaine, architecturale et environnementale ZAE DU » with SAGEP (Var) : 07/10/2026
Across these 5 contracts: median amount €505,579 (4 published) ; median of 6 bids (2 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 14 décembre 2026, in 23 days.
- Confirm the submission time or time zone on the buyer's platform.
- Duration: 12 months.
- environmental criteria are scored. That is where a local firm earns points a large group does not.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution), the estimated value. These are in the consultation rules inside the tender file.
How many rivals you actually face
sur les marchés « Etude », la médiane est de 4 offres par lot. 29 % des lots en reçoivent trois ou moins, et seulement 13 % dépassent dix candidats.
94 % des offres viennent de PME.
Stakes: Enjeu observé : 313 324 € (médiane du métier, 364 marchés), 5 offres attendues (médiane du métier, 249 marchés) ; environ 62 665 € espérés, ordre de grandeur, pas un devis.
Measured on 75 awarded lots that publish their statistics. 55% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-112997.