26TA13-Travaux d'aménagement d'une piste cyclable intercommunale sur le boulevard du Golf à Courdimanche et Cergy
Communauté d'Agglomération de Cergy-Pontoise
Val-d'Oise
17 sept. 2026
10 sept. 2026
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- The notice was amended on 2026-09-12 and the deadline changed: from 2026-09-17 to 2026-09-21. The new one prevails.
- Bids due on 21 septembre 2026 (deadline amended by the buyer).
- The contract is split into 2 lots. You may bid on the one that fits you only.
- Duration: 6 months, renewable.
- environmental criteria are scored. That is where a local firm earns points a large group does not.
- Performance starts on 10 novembre 2026.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution), the estimated value. These are in the consultation rules inside the tender file.
marches_publics@cergypontoise.fr 0134414243
How many rivals you actually face
sur l'ensemble des marchés français, la médiane est de 3 offres par lot. 54 % des lots en reçoivent trois ou moins, et seulement 8 % dépassent dix candidats.
66 % des offres viennent de PME.
Measured on 4669 awarded lots that publish their statistics. 53% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-87072.