Restructuration et rénovation énergétique de l'Institut de Vigne à Semur-en-Auxois (21140)
Conseil Départemental de Côte d'Or (21)
Côte-d'Or
08 oct. 2026
10 sept. 2026
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 8 octobre 2026, in 13 days.
- The contract is split into 15 lots. You may bid on the one that fits you only.
- Duration: 6 months, renewable.
- Estimated value: 6 032 279 €.
- environmental criteria are scored. That is where a local firm earns points a large group does not.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution). These are in the consultation rules inside the tender file.
dgsd.prat.dfcpv.scp@cotedor.fr +33 380636917
How many rivals you actually face
sur les marchés « Bâtiment », la médiane est de 4 offres par lot. 46 % des lots en reçoivent trois ou moins, et seulement 3 % dépassent dix candidats.
88 % des offres viennent de PME.
Measured on 218 awarded lots that publish their statistics. 53% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-87217.