Marché de Conception Réalisation pour le Branchement Electrique des Navires A Quai (BENAQ) du GPMB
Grand Port Maritime de Bordeaux
Gironde
02 nov. 2026
13 sept. 2026
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- A single lot: the contract is taken whole or not at all.
- La technique pèse 50 % contre 50 % au prix. Un bon mémoire passe devant un concurrent moins cher.
- Duration: 36 months (3 ans).
- Estimated value: 19 000 000 €.
- environmental criteria are scored. That is where a local firm earns points a large group does not.
The notice does not state : the question deadline. These are in the consultation rules inside the tender file.
marches@bordeaux-port.fr +33 5 54 68 99 56
How this buyer will score
La technique pèse 50 % contre 50 % au prix. Un bon mémoire passe devant un concurrent moins cher.
- 50% Prix des prestations
- 20% Valeur technique
- 10% Valeur environnementale
- 20% Délai global
How many rivals you actually face
sur l'ensemble des marchés français, la médiane est de 3 offres par lot. 54 % des lots en reçoivent trois ou moins, et seulement 8 % dépassent dix candidats.
66 % des offres viennent de PME.
Measured on 4669 awarded lots that publish their statistics. 53% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-88070.