Fourniture et acheminement d'électricité pour la ville et le CCAS de Wasquehal
Ville de Wasquehal
Nord
23 oct. 2026
13 sept. 2026
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 23 octobre 2026, in 28 days.
- 3 suppliers will be selected: you do not need to be the best, only to be in the top 3.
- The contract is split into 3 lots. You may bid on the one that fits you only.
- Duration: 3 months.
- Estimated value: 2 400 000 €.
- Performance starts on 1er janvier 2027.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution). These are in the consultation rules inside the tender file.
florine.parein@ville-wasquehal.fr +33 320657218
How many rivals you actually face
sur l'ensemble des marchés français, la médiane est de 3 offres par lot. 54 % des lots en reçoivent trois ou moins, et seulement 8 % dépassent dix candidats.
66 % des offres viennent de PME.
Measured on 4666 awarded lots that publish their statistics. 53% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-88407.