Gn26p012 - Accord-Cadre Pour Travaux Divers Sur Le Territoire Du Grand Narbonne Travaux De Pose De Clotures, Portails Et Equipements Exterieurs
Communauté d'agglomération du Grand Narbonne
Aude
12 oct. 2026
11 sept. 2026
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- social and environmental criteria are scored. That is where a local firm earns points a large group does not.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution), the contract duration, the estimated value. These are in the consultation rules inside the tender file.
How many rivals you actually face
sur l'ensemble des marchés français, la médiane est de 3 offres par lot. 54 % des lots en reçoivent trois ou moins, et seulement 8 % dépassent dix candidats.
66 % des offres viennent de PME.
Measured on 4669 awarded lots that publish their statistics. 53% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-88439.