25T111 CH LE VINATIER CHLV 111 Pierres plantées aménagement d'une maison de santé pluridisciplinaire
CHU Lyon
Rhône
19 oct. 2026
14 sept. 2026
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- The notice was amended on 2026-09-18. The deadline did not move, so the file itself changed: reread it before submitting, a bid answering the previous version gets rejected.
- environmental criteria are scored. That is where a local firm earns points a large group does not.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution), the contract duration, the estimated value. These are in the consultation rules inside the tender file.
How many rivals you actually face
sur les marchés « Chauffage (travaux) », la médiane est de 2 offres par lot. 75 % des lots en reçoivent trois ou moins, et seulement 0 % dépassent dix candidats.
Measured on 12 awarded lots that publish their statistics. 53% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-88827.