Prestations d'Assurances Construction: opération de construction dite GM3 (construction et réhabilitation)
63 CHU
Puy-de-Dôme
30 oct. 2026
18 sept. 2026
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Questions to the buyer until 20 octobre 2026, i.e. 25 days.
- Bids due on 30 octobre 2026, in 35 days.
- The contract is split into 2 lots. You may bid on the one that fits you only.
- Le prix pèse 60 %, la technique 40 %. Il faut les deux : un prix serré ET un mémoire qui ne perd pas de points.
- Duration: 3 months, renewable.
- social and environmental criteria are scored. That is where a local firm earns points a large group does not.
The notice does not state : the estimated value. These are in the consultation rules inside the tender file.
bdm@chu-clermontferrand.fr +33 4 73 75 12 34
How this buyer will score
Le prix pèse 60 %, la technique 40 %. Il faut les deux : un prix serré ET un mémoire qui ne perd pas de points.
- 60% Prix de la prime à payer
- 40% valeur technique avec sous-critères dans le RC
How many rivals you actually face
sur les marchés « Assurance », la médiane est de 2 offres par lot. 80 % des lots en reçoivent trois ou moins, et seulement 4 % dépassent dix candidats.
36 % des offres viennent de PME, et dans 63 % des lots aucune PME n'a candidaté.
Measured on 46 awarded lots that publish their statistics. 53% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-89891.