Algunos contenidos están en inglés. El texto original del anuncio es la referencia.

Électricité & génie climatique07 dic 2026Procédure NC

SMOD2 - Travaux - EPC -Conception et Réalisation (Formalisé)

Buyer

CSMOD2

Location

Vaucluse

Deadline

07 dic 2026

07 dic 2026 · Fecha por verificar
Published

19 sept 2026

Open the notice & tender file ↗ Read the expert study (in French) Download the bid file (ZIP, in French)

To win this one

  • The stakes: Enjeu observé : 639 681 € (médiane du métier, 169 marchés), 3 offres attendues (médiane du métier, 117 marchés) ; environ 213 227 € espérés, ordre de grandeur, pas un devis.
  • The clock: 19 days: start this week, site visit or questions to the buyer before the end of week one.

Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.

Who won similar contracts

  • MIANE ET VINATIER, SOCALIM won « Réalisation d'études et travaux d'électrification, d'éclairage public et de réseaux de télécommunications - Lo » with S.E.H.V (Haute-Vienne) : 29/10/2026
  • DALKIA, ENGIE ENERGIE SERVICES won « Contrat de Performance Energétique en vue de l'exploitation des installations de génie climatique et de la réa » with SA HLM IRP (Hauts-de-Seine) : 2 308 193 €, 3 bids, 25/09/2026
  • ATTA won « Guyane (973), FAG, Tous sites, Accord-cadre mixte portant sur la réalisation d’études et d’AMO pour les ins » with DID CAYENNE (Guyane) : 3 bids, 16/09/2026

Across these 3 contracts: median amount €2,308,193 (1 published) ; median of 3 bids (2 published).

Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.

The essentials, in thirty seconds

Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.

  • Bids due on 7 décembre 2026, in 19 days.
  • Confirm the submission time or time zone on the buyer's platform.
  • A single lot: the contract is taken whole or not at all.
  • Variants are REQUIRED: a bid without one would be irregular there. Read exactly what the rules expect, lot by lot.

The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution), the contract duration, the estimated value. These are in the consultation rules inside the tender file.

Ask the buyer a question

t.pichon@vensolair.fr +33 676978735

Open the tender file

How many rivals you actually face

sur l'ensemble des marchés français, la médiane est de 3 offres par lot. 55 % des lots en reçoivent trois ou moins, et seulement 9 % dépassent dix candidats.

3bids per lot, median
19%of lots get a single bidder
55%of lots get 3 bidders or fewer

67 % des offres viennent de PME, et dans 20 % des lots aucune PME n'a candidaté.

Stakes: Enjeu observé : 639 681 € (médiane du métier, 169 marchés), 3 offres attendues (médiane du métier, 117 marchés) ; environ 213 227 € espérés, ordre de grandeur, pas un devis.

Measured on 4333 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.

Run your radar to see how well this contract fits you, and get the next ones automatically. Describir mi actividad →

Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-90252.