Fournitures & équipementslast dayProcédure Ouverte

Accord-cadre relatif à la fourniture de carburants, de combustibles et d’additifs

Buyer

Brest métropole

Location

Finistère

Deadline

25 sept. 2026

last day
Published

20 sept. 2026

Open the notice & tender file ↗

The essentials, in thirty seconds

Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.

  • Bids due on 25 septembre 2026, in 0 days.
  • 3 suppliers will be selected: you do not need to be the best, only to be in the top 3.
  • The contract is split into 4 lots. You may bid on the one that fits you only.
  • Le prix pèse 60 %, la technique 40 %. Il faut les deux : un prix serré ET un mémoire qui ne perd pas de points.
  • Duration: 4 months.
  • Estimated value: 8 890 800 €.
  • environmental criteria are scored. That is where a local firm earns points a large group does not.

The notice does not state : the question deadline. These are in the consultation rules inside the tender file.

Ask the buyer a question

marches@brest-metropole.fr 0298335411

Open the tender file

How this buyer will score

Le prix pèse 60 %, la technique 40 %. Il faut les deux : un prix serré ET un mémoire qui ne perd pas de points.

Quality 40 %Price 60 %
  • 35% Valeur technique
  • 5% Performance environnementale
  • 60% Prix des prestations
Prepare my technical proposal →

How many rivals you actually face

sur les marchés « Carburant, hydrocarbure », la médiane est de 3 offres par lot. 54 % des lots en reçoivent trois ou moins, et seulement 0 % dépassent dix candidats.

3bids per lot, median
8 %of lots get a single bidder
54 %of lots get 3 bidders or fewer

0 % des offres viennent de PME, et dans 100 % des lots aucune PME n'a candidaté.

Measured on 24 awarded lots that publish their statistics. 53% of buyers do; the rest say nothing, either way.

The bid as a jobsite

0/9

6 étape(s) critique(s) ont déjà dépassé leur date, et il en reste 7 au total. Décidez aujourd'hui si vous y allez quand même.

0 days left: the schedule is compressed. The dates below are the latest possible, not the comfortable ones.

  • 21/09 Gather tax and social clearance Administratif URSSAF clearance is not instant, and an expired certificate rejects an otherwise excellent bid. Request it early, not the night before.
  • 21/09 Produce three years of turnover and headcount Comptabilité These figures are requested for every contract, in the same format. Gathered once, they serve everywhere.
  • 22/09 Describe the staff and equipment assigned Conducteur de travaux Only the operations lead knows how many staff, what equipment, what organisation. Nobody else can write it without inventing.
  • 22/09 Freeze the price and fill the schedule Chiffrage Price carries 60% of the score here: it decides, and deserves the time.
  • 23/09 Draft the technical proposal Chargé d'affaires Quality carries 40% of the score. The outline is already derived from the buyer's grid.
  • 24/09 Reread, and check the document list item by item Direction By someone who did not write it. A wrong figure or a missing document takes ten minutes to spot with fresh eyes, never with the author's.
  • 24/09 Check the electronic signature certificate Direction This is where finished bids die: expired certificate, browser that refuses it, director travelling. Three days out it is fixable. The night before it is not.
  • 24/09 Upload to the buyer's platform Chargé d'affaires Never on the last day. Platforms saturate at deadlines, large uploads fail, and a bid completed one minute late is a bid the buyer is not allowed to open.
  • 25/09 Decide: bid or not Direction A bid takes five people three days. Decide now, not after someone has started writing.

Dates are computed backwards from the deadline, except the question date which the buyer sets. A name in the right-hand box is enough: everyone knows what is theirs, and three days out you see what is missing.

Note your strengths while they are fresh

This contract scores "Valeur technique". What makes you strong on it?

Nothing goes to the buyer. These notes fill your library, which is used to draft your proposals and to measure what you lack.

Run your radar to see how well this contract fits you, and get the next ones automatically. Descrie activitatea mea →

Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-90744.