ACCORD-CADRE MISSIONS DE MAÎTRISE D'OeUVRE ET DE CONSEIL POUR DES OPÉRATIONS DE VOIRIE ET DE RÉSEAUX DIVERS (VRD)
Mairie de Noisiel
Seine-et-Marne
26 oct. 2026
23 sept. 2026
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 26 octobre 2026, in 31 days.
- A single supplier will be selected. All or nothing.
- A single lot: the contract is taken whole or not at all.
- Duration: 180 months (15 ans).
- social and environmental criteria are scored. That is where a local firm earns points a large group does not.
- Performance starts on 1er janvier 2027.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution), the estimated value. These are in the consultation rules inside the tender file.
marches@mairie-noisiel.fr +33 160377349
How many rivals you actually face
sur les marchés « Maîtrise d'oeuvre », la médiane est de 6 offres par lot. 32 % des lots en reçoivent trois ou moins, et seulement 34 % dépassent dix candidats.
92 % des offres viennent de PME.
Measured on 88 awarded lots that publish their statistics. 53% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-91526.