Investigations pour la détection, le marquage et le géoréférencement des réseaux
LE MURETAIN AGGLO
Haute-Garonne
30 oct. 2026
24 sept. 2026
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 30 octobre 2026, in 35 days.
- 3 suppliers will be selected: you do not need to be the best, only to be in the top 3.
- A single lot: the contract is taken whole or not at all.
- Duration: 6 months.
- social and environmental criteria are scored. That is where a local firm earns points a large group does not.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution), the estimated value. These are in the consultation rules inside the tender file.
marches.publics@agglo-muretain.fr +33 534466140
How many rivals you actually face
sur l'ensemble des marchés français, la médiane est de 3 offres par lot. 54 % des lots en reçoivent trois ou moins, et seulement 8 % dépassent dix candidats.
66 % des offres viennent de PME.
Measured on 4666 awarded lots that publish their statistics. 53% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-91859.