Bâtiment & gros œuvre31d leftProcédure Ouverte

Travaux de réhabilitation du réservoir d'eau potable de Saint-Claude situé à Besançon

Buyer

Grand Besançon Métropole

Location

Doubs

Deadline

26 oct. 2026

31d left
Published

23 sept. 2026

Open the notice & tender file ↗

The essentials, in thirty seconds

Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.

  • social and environmental criteria are scored. That is where a local firm earns points a large group does not.

The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution), the contract duration, the estimated value. These are in the consultation rules inside the tender file.

Open the tender file

How many rivals you actually face

sur les marchés « Alimentation en eau potable », la médiane est de 4 offres par lot. 37 % des lots en reçoivent trois ou moins, et seulement 5 % dépassent dix candidats.

4bids per lot, median
5 %of lots get a single bidder
37 %of lots get 3 bidders or fewer

Measured on 19 awarded lots that publish their statistics. 53% of buyers do; the rest say nothing, either way.

Run your radar to see how well this contract fits you, and get the next ones automatically. Mein Gewerbe beschreiben →

Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-91893.