Niektóre treści są dostępne po angielsku. Wiążący jest oryginalny tekst ogłoszenia.
Rénovation énergétique et globale du bâtiment communal
COMMUNE DE SORBOLLANO
Corse-du-Sud
06 lis 2026
23 wrz 2026
To win this one
- The stakes: Enjeu observé : 500 000 € (médiane du métier, 335 marchés), 3 offres attendues (médiane du métier, 216 marchés) ; environ 166 667 € espérés, ordre de grandeur, pas un devis.
- The clock: 11 days: start this week, site visit or questions to the buyer before the end of week one.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- SAS SOULIER, LEON GROSSE won « Marché public global de performance énergétique pour la rénovation de l'EREA Albert Monier à Aurillac » with SOC PUB LOCALE EFFICACITE ENERGETIQUE (Cantal) : 7 549 505 €, 21/10/2026
- ARVERNOISE DE CONSTRUCTION, MARCILLON THUILIER ARCHITECTES (MTA) won « Marché public global de performance énergétique pour la rénovation du Lycée Henri Sainte Claire Deville à Isso » with SOCIETE PUBLIQUE LOCALE D'EFFICACITE ENERGETIQUE - SPL OSER (Puy-de-Dôme) : 4 248 274 €, 21/10/2026
- SPTP, ENTREPRISE MIDALI FRERES won « TRAVAUX DE RÉNOVATION ÉNERGETIQUE ET EXTENSION DE L'ÉCOLE HAUT MACHÉ » with Ville de Chambéry (Savoie) : 418 389 €, 3 bids, 04/09/2026
- DALKIA won « Marché Global de Performance orienté « Systèmes » pour la rénovation énergétique de 22 sites du patrimoine de » with Ville de Créteil (Val-de-Marne) : 7 189 246 €, 06/09/2026
- AZUR BATIMENT, TERRITOIRE won « LYCEE JEAN MOULIN - DRAGUIGNAN - Réhabilitation et rénovation énergétique de l'internat et rénovation du systè » with Région Provence-Alpes-Côte d'Azur (Alpes-Maritimes) : 377 021 €, sole bidder, 06/09/2026
Across these 5 contracts: median amount €4,248,274 (5 published) ; median of 2 bids (2 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 6 novembre 2026, in 11 days.
- environmental criteria are scored. That is where a local firm earns points a large group does not.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution), the contract duration, the estimated value. These are in the consultation rules inside the tender file.
How many rivals you actually face
sur l'ensemble des marchés français, la médiane est de 3 offres par lot. 57 % des lots en reçoivent trois ou moins, et seulement 8 % dépassent dix candidats.
70 % des offres viennent de PME.
Stakes: Enjeu observé : 500 000 € (médiane du métier, 335 marchés), 3 offres attendues (médiane du métier, 216 marchés) ; environ 166 667 € espérés, ordre de grandeur, pas un devis.
Measured on 4434 awarded lots that publish their statistics. 53% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-92059.