Algunos contenidos están en inglés. El texto original del anuncio es la referencia.
Reservoir construction works, EMPREITADA DE CONSTRUÇÃO DE 2 RESERVATÓRIOS PARA O ARMAZENAMENTO DE ÁGUA PARA O CONSUMO HUMANO NO ALTO DA RIBEIRA DO CABO, FREGUESIA DO CAPELO E NO LARGO JAIME MELO, FREGUESIA DOS FLAMENGOS, CONCELHO DA HORTA
Município da Horta
Portugal
22 nov 2026
28 oct 2026
To win this one
- The clock: 1 day: bid only if your administrative documents are already in hand; a proposal gets finished in that time, not started.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
How many rivals you actually face
sur l'ensemble des marchés français, la médiane est de 3 offres par lot. 56 % des lots en reçoivent trois ou moins, et seulement 8 % dépassent dix candidats.
64 % des offres viennent de PME, et dans 21 % des lots aucune PME n'a candidaté.
Measured on 4519 awarded lots that publish their statistics. 55% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference ted-745673-2026.