Unele materiale sunt disponibile în engleză. Textul original al anunțului este cel de referință.
Construction, foundation and surface works for highways, roads, Projekt i budowa drogi ekspresowej S19 na odcinku granica woj. podlaskiego, Łosice, granica woj. lubelskiego, odc. realizacyjny nr 2: węzeł „Łosice” (z węzłem), granica woj
Generalna Dyrekcja Dróg Krajowych i Autostrad
Polonia
08 dec. 2026
30 oct. 2026
To win this one
- The clock: 14 days: start this week, site visit or questions to the buyer before the end of week one.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
How many rivals you actually face
sur l'ensemble des marchés français, la médiane est de 3 offres par lot. 56 % des lots en reçoivent trois ou moins, et seulement 8 % dépassent dix candidats.
63 % des offres viennent de PME, et dans 23 % des lots aucune PME n'a candidaté.
Measured on 4508 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference ted-753716-2026.