Alcuni contenuti sono disponibili in inglese. Fa fede il testo originale dell’avviso.
Construction work for school buildings, Obras de construcción de la fase 1 de un centro integrado de 6+12+16+6 unidades (infantil, primaria, secundaria, bachillerato) en la calle Cortadura del Valle (solar del Brull) de Ceuta.
Presidencia de la Gerencia de Infraestructuras y Equipamientos de Cultura O.A
Spagna
16 feb 2027
12 nov 2026
To win this one
- The clock: 90 days: time to question the buyer, visit, and write a tailored proposal.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
How many rivals you actually face
sur l'ensemble des marchés français, la médiane est de 3 offres par lot. 55 % des lots en reçoivent trois ou moins, et seulement 9 % dépassent dix candidats.
67 % des offres viennent de PME, et dans 20 % des lots aucune PME n'a candidaté.
Measured on 4333 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference ted-789170-2026.