Alcuni contenuti sono disponibili in inglese. Fa fede il testo originale dell’avviso.
Lot 1: Improving the 1.5-Kilometer airport to Pou Bay Bridge Road in Chuuk • Lot 2: Replacing two short-span (6-meter-long) steel and concrete composite bridges in Yap • Lot 3: Replacing the 12-meter Awak bridge
Department of Transportation, Communications and Infrastructure
Micronesia
07 dic 2026
22 ott 2026
To win this one
- The clock: 17 days: start this week, site visit or questions to the buyer before the end of week one.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
How many rivals you actually face
sur l'ensemble des marchés français, la médiane est de 3 offres par lot. 55 % des lots en reçoivent trois ou moins, et seulement 8 % dépassent dix candidats.
67 % des offres viennent de PME, et dans 20 % des lots aucune PME n'a candidaté.
Measured on 4443 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference worldbank-OP00476469.