Unele materiale sunt disponibile în engleză. Textul original al anunțului este cel de referință.
Technical proposal
MISSION DE MAÎTRISE D'OEUVRE RELATIVE AUX ÉTUDES DES TRAVAUX POST-CYCLONIQUE « CHIDO » RECONSTRUCTION DE LA MAISON DE FRANCE SERVICES À HAMJAGO
Buyer Ville de Mtsamboro (976)
La technique pèse 60 % contre 40 % au prix. Un bon mémoire passe devant un concurrent moins cher.
This plan mirrors the scoring grid the buyer published in the notice, criterion by criterion, in the order they will score them.
The outline, in the grid's order
-
50%
Valeur technique
-
10%
Délai d’études
Tendveo drafts from your material and marks [TO PROVIDE] what is missing. The automated check does not catch every invention: reread every figure, name, reference and certification. A technical proposal is a declaration to a public buyer: an inaccurate reference or certification exposes you to exclusion.