Sommige inhoud is beschikbaar in het Engels. De oorspronkelijke bekendmaking is leidend.

Technical proposal

2026-011

Buyer SICECO (21)

La technique pèse 58 % contre 42 % au prix. Un bon mémoire passe devant un concurrent moins cher.

This plan mirrors the scoring grid the buyer published in the notice, criterion by criterion, in the order they will score them.

The outline, in the grid's order

  1. 70%

    Cf. RC Pour tous les lots

    Critère technique (pts 1 à 4 du mémoire) 70% Critère environnemental (pts 5 et 6 du mémoire) 30% Total : 50%

    100% of the technical score · about 2200 words expected

The plan is public because it comes from the notice. To match it against YOUR material and draft, you need an account. Create my workspace →

Tendveo drafts from your material and marks [TO PROVIDE] what is missing. The automated check does not catch every invention: reread every figure, name, reference and certification. A technical proposal is a declaration to a public buyer: an inaccurate reference or certification exposes you to exclusion.