World Bank · Procurement Notices
Les avis de passation financés par la Banque mondiale, dans des dizaines de pays (Afrique, Asie, Amérique latine) souvent absents des portails nationaux ouverts. L'API publique expose des centaines de milliers d'avis SANS clé. Connecteur branché en production (testé le 26/06/2026) : récupération des avis d'OPPORTUNITÉ récents (appels d'offres, manifestations d'intérêt, préqualifications), date de soumission incluse, pays mappé en code ISO, normalisés au schéma unifié. C'est le levier « tous les pays en développement » du moat.
Construction of 765/220 kV Grid Station at Mansehra
Construction of 765 kV Dasu Transmission Line in two LOTS LOT-1. Dasu to Mansehra (157 kM) LOT-2. Mansehra to Islamabad (97.6 kM)
DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF 500kV DOUBLE CIRCUIT TRANSMISSION LINE FROM 500kV TARBELA 5th EXTENSION SWITCHYARD TO 765/500kV ISLAMABAD WEST SUBSTATION
River Training Works of Guddu Barrage
Fourniture de matériels informatiques pour les Unités d'Exécution du PDSS et du PMNS, pour le Secrétariat Général à la Santé, pour les Inspections Provinciales de Santé, et pour les structures partenaires du PMNS
Installation of 21 MW Solar PV in Addu City, Fuvahmulah City, Kulhudhufush Cityi, GDh Thinadhoo, B. Eydhafushi and Lh. Hinnavaru.
Package CSG-W01: Construction of substation (incl. sypply of testing & commisioning for primary equipment) for 500kV and 220kV substations
Construction of Four Pedestrian Foot Bridges at Selected Location within Freetown Municipality
Design, Construction and Operation of Five Cities Faecal Sludge Treatment Plant (FSTP) under two lots ( Lot I Adama, Dire Dewa and Mekelle and Lot II Bahir Dar and Hawasa). Implementing Agency: Water Development Commission.
Supply, installation, configuration, setup, testing, related services and training of: - BD-NSW software solution; - BD-NSW risk management software; - Valuation database software.
Design, Supply and Installation of a unified data collection and spatial analysis platform (MDC-GIS)
Development of Solar Hybrid Power Systems for Universities and Teaching Hospitals
Contract No. SBIP/S1: Restoration and Up gradation of Sukkur Barrage.
Selection of commercial partners for WSS Service in Selected Peri-urban and Rural Areas of Jingyang District
Rebidding for Supply, Design and Implementation of ERP along with Supply and Commissioning of Hardware and Change Management Consultancy on Turnkey Basis
Improvement of Nagdhunga - Naubise - Mugling Road and Bridges [CH: 0+000 Km to CH: 12+260 Km, Tribhuban Highway]
Improvement of Nagdhunga - Naubise - Mugling Road and Bridges [CH: 0+000 Km to CH: 43+540 Km, Prithivi Highway]
Travaux de la Réhabilitation et l’Entretien Pluriannuel du Corridor Transaharien (RN 11 Nord) entre Agadez et Zinder
Design Build and Operation (DBO) of Kotobe and Kitime Waste Water Treatment Plants for Eastern Addis Ababa Catchment Sewer System
Petites entreprises agropastorales: Recrutement des petites entreprises agropastorales pour la mise en œuvre du "Matching grant" autour de Bangui
Recrutement des coopératives agropastorales pour la mise en œuvre du "Matching Grant" autour de Bangui
Moyennes entreprises agropastorales: Recrutement des PME agropastorales pour la mise en œuvre du "Matching grant" autour de Bangui
Reconstruction, Expansion and Operation of Pagla STP.
Reconstruction of Western Trunk Main
APS Licenses Upgrades/ AfPay systems development including hardware
Enterprise Resources Planning (ERP) -3 LOTs
Student Life Cycle Solution (SLCS) -3 LOTS
Construction of Mbezi Beach Waste Water Treatment Plant (Design and Build Operation)
Gabral Kalam Hydropower Project : Package 1: Civil Works - water conveyance structure (weir, diversion structure, tunnels, etc.), access roads, and bridges.
Gabral Kalam Hydropower Project: Package 2: Power House (Supply & Install) - civil structure; turbines, generators, electrical system, switchyard, power evacuation
Improvement of Nagdhunga - Naubise - Mugling Road and Bridges [CH: 43+542 Km to CH: 82+403 Km, Prithivi Highway]
Reconstruction of Eastern Trunk Main
Rehabilitation of the M3 Alat-Astara-State Border of Iran Highway Between Yenikend and Bilasuvar (km 31.0 - km 101.0) (Original Alignment)
Dredging of Odaw River Main Channel and Selected Tributaries and Clearing
Design and Build Services for Refurbishment and Upgrading of Mambo Wastewater Treatment Plant and Associated Works
Reconstruction/New Construction/Rehabilitation of Sewerage Networks in Zone - A (Kalabagan, Mogbazar, Shahbag, Eskaton, Arambag, Paltan, Shahidbag, Motijheel etc.)
Rehabilitation of SCADA System in Transmission Network
Reconstruction/New Construction/Rehabilitation of Sewerage Networks in Zone - B (Rampura, Taltola, Bashaboo, Golapbag, Ahmedbag, Saidabad, Goran, Baganbari, Khilgaon, West Nandipara etc)
Construction of RUDP II phase 3 Asphalt roads in the city of MUHANGA
Design-Build of Ibo Jetty and Buzi Wharf
Sources voisines
Source : World Bank · Procurement Notices · World Bank Open Data · réutilisation libre (CC-BY 4.0, à reconfirmer par avis) · normalisé par Tendveo
Activer cette source
endpoint testé le 26/06/2026Le guide reproductible pour brancher cette source en production. On dit clairement ce qui est ouvert, ce qui demande une clé, et ce qui reste à confirmer.
- 1 · Ce que c'est
- Les avis de passation financés par la Banque mondiale, dans des dizaines de pays (Afrique, Asie, Amérique latine) souvent absents des portails nationaux ouverts. L'API publique expose des centaines de milliers d'avis SANS clé. Connecteur branché en production (testé le 26/06/2026) : récupération des avis d'OPPORTUNITÉ récents (appels d'offres, manifestations d'intérêt, préqualifications), date de soumission incluse, pays mappé en code ISO, normalisés au schéma unifié. C'est le levier « tous les pays en développement » du moat. Portée : nationale.
- 3 · Accès
- Accès ouvert (sans clé). Aucune clé. L'API Procurement Notices de la Banque mondiale (search.worldbank.org/api/v2/procnotices) est ouverte SANS clé. Connecteur branché en production (testé le 26/06/2026) : pagination par offset (paramètre os), filtrage sur les avis d'OPPORTUNITÉ (appels d'offres, manifestations d'intérêt, préqualifications, avis général), mapping du nom de pays vers son code ISO, normalisation au schéma unifié (objet = description de l'avis, date limite = date de soumission). Classement par groupe d'achat (CW/GO/CS/NC), pas CPV → CPV vide assumé. Plan cron : récupération quotidienne des avis récents.
- 4 · Endpoint / format
- API ouverte Banque mondiale (JSON, sans clé)
https://search.worldbank.org/api/v2/procnotices?format=json - 5 · Où coller la clé
- Aucune clé. Pour surcharger l'endpoint au déploiement :
TENDVEO_SRC_WORLDBANK_ENDPOINT. - 6 · Comment tester
- Lance
node connectors/run.mjs worldbanket vérifie que N marchés réels remontent.