World Bank · Procurement Notices
Procurement notices financed by the World Bank, across dozens of countries (Africa, Asia, Latin America) often missing from open national portals. The public API exposes hundreds of thousands of notices WITHOUT a key. Connector wired in production (tested 2026-06-26): fetch of recent OPPORTUNITY notices (invitations for bids, expressions of interest, prequalifications), submission deadline included, country mapped to ISO code, normalised to the unified schema. This is the moat's "every developing country" lever.
Construction of 765/220 kV Grid Station at Mansehra
Construction of 765 kV Dasu Transmission Line in two LOTS LOT-1. Dasu to Mansehra (157 kM) LOT-2. Mansehra to Islamabad (97.6 kM)
DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF 500kV DOUBLE CIRCUIT TRANSMISSION LINE FROM 500kV TARBELA 5th EXTENSION SWITCHYARD TO 765/500kV ISLAMABAD WEST SUBSTATION
River Training Works of Guddu Barrage
Fourniture de matériels informatiques pour les Unités d'Exécution du PDSS et du PMNS, pour le Secrétariat Général à la Santé, pour les Inspections Provinciales de Santé, et pour les structures partenaires du PMNS
Installation of 21 MW Solar PV in Addu City, Fuvahmulah City, Kulhudhufush Cityi, GDh Thinadhoo, B. Eydhafushi and Lh. Hinnavaru.
Package CSG-W01: Construction of substation (incl. sypply of testing & commisioning for primary equipment) for 500kV and 220kV substations
Construction of Four Pedestrian Foot Bridges at Selected Location within Freetown Municipality
Design, Construction and Operation of Five Cities Faecal Sludge Treatment Plant (FSTP) under two lots ( Lot I Adama, Dire Dewa and Mekelle and Lot II Bahir Dar and Hawasa). Implementing Agency: Water Development Commission.
Supply, installation, configuration, setup, testing, related services and training of: - BD-NSW software solution; - BD-NSW risk management software; - Valuation database software.
Design, Supply and Installation of a unified data collection and spatial analysis platform (MDC-GIS)
Development of Solar Hybrid Power Systems for Universities and Teaching Hospitals
Contract No. SBIP/S1: Restoration and Up gradation of Sukkur Barrage.
Selection of commercial partners for WSS Service in Selected Peri-urban and Rural Areas of Jingyang District
Rebidding for Supply, Design and Implementation of ERP along with Supply and Commissioning of Hardware and Change Management Consultancy on Turnkey Basis
Improvement of Nagdhunga - Naubise - Mugling Road and Bridges [CH: 0+000 Km to CH: 12+260 Km, Tribhuban Highway]
Improvement of Nagdhunga - Naubise - Mugling Road and Bridges [CH: 0+000 Km to CH: 43+540 Km, Prithivi Highway]
Travaux de la Réhabilitation et l’Entretien Pluriannuel du Corridor Transaharien (RN 11 Nord) entre Agadez et Zinder
Design Build and Operation (DBO) of Kotobe and Kitime Waste Water Treatment Plants for Eastern Addis Ababa Catchment Sewer System
Petites entreprises agropastorales: Recrutement des petites entreprises agropastorales pour la mise en œuvre du "Matching grant" autour de Bangui
Recrutement des coopératives agropastorales pour la mise en œuvre du "Matching Grant" autour de Bangui
Moyennes entreprises agropastorales: Recrutement des PME agropastorales pour la mise en œuvre du "Matching grant" autour de Bangui
Reconstruction, Expansion and Operation of Pagla STP.
Reconstruction of Western Trunk Main
APS Licenses Upgrades/ AfPay systems development including hardware
Enterprise Resources Planning (ERP) -3 LOTs
Student Life Cycle Solution (SLCS) -3 LOTS
Construction of Mbezi Beach Waste Water Treatment Plant (Design and Build Operation)
Gabral Kalam Hydropower Project : Package 1: Civil Works - water conveyance structure (weir, diversion structure, tunnels, etc.), access roads, and bridges.
Gabral Kalam Hydropower Project: Package 2: Power House (Supply & Install) - civil structure; turbines, generators, electrical system, switchyard, power evacuation
Improvement of Nagdhunga - Naubise - Mugling Road and Bridges [CH: 43+542 Km to CH: 82+403 Km, Prithivi Highway]
Reconstruction of Eastern Trunk Main
Rehabilitation of the M3 Alat-Astara-State Border of Iran Highway Between Yenikend and Bilasuvar (km 31.0 - km 101.0) (Original Alignment)
Dredging of Odaw River Main Channel and Selected Tributaries and Clearing
Design and Build Services for Refurbishment and Upgrading of Mambo Wastewater Treatment Plant and Associated Works
Reconstruction/New Construction/Rehabilitation of Sewerage Networks in Zone - A (Kalabagan, Mogbazar, Shahbag, Eskaton, Arambag, Paltan, Shahidbag, Motijheel etc.)
Rehabilitation of SCADA System in Transmission Network
Reconstruction/New Construction/Rehabilitation of Sewerage Networks in Zone - B (Rampura, Taltola, Bashaboo, Golapbag, Ahmedbag, Saidabad, Goran, Baganbari, Khilgaon, West Nandipara etc)
Construction of RUDP II phase 3 Asphalt roads in the city of MUHANGA
Design-Build of Ibo Jetty and Buzi Wharf
Neighbouring sources
Fuente : World Bank · Procurement Notices · World Bank Open Data · réutilisation libre (CC-BY 4.0, à reconfirmer par avis) · normalised by Tendveo
Activate this source
endpoint tested 2026-06-26The reproducible guide to wire this source into production. We say clearly what is open, what needs a key, and what remains to confirm.
- 1 · What it is
- Procurement notices financed by the World Bank, across dozens of countries (Africa, Asia, Latin America) often missing from open national portals. The public API exposes hundreds of thousands of notices WITHOUT a key. Connector wired in production (tested 2026-06-26): fetch of recent OPPORTUNITY notices (invitations for bids, expressions of interest, prequalifications), submission deadline included, country mapped to ISO code, normalised to the unified schema. This is the moat's "every developing country" lever. Scope : national.
- 3 · Access
- Open access (no key). No key. The World Bank's Procurement Notices API (search.worldbank.org/api/v2/procnotices) is open WITHOUT a key. Connector wired in production (tested 2026-06-26): offset paging (os parameter), filtering on OPPORTUNITY notices (invitations for bids, expressions of interest, prequalifications, general notices), country-name to ISO-code mapping, normalisation to the unified schema (object = notice description, deadline = submission date). Procurement-group classification (CW/GO/CS/NC), not CPV → CPV left empty by design. Cron plan: daily fetch of recent notices.
- 4 · Endpoint / format
- Open World Bank API (JSON, keyless)
https://search.worldbank.org/api/v2/procnotices?format=json - 5 · Where to paste the key
- No key. To override the endpoint at deployment :
TENDVEO_SRC_WORLDBANK_ENDPOINT. - 6 · How to test
- Run
node connectors/run.mjs worldbankand check that N real contracts come back.