Einige Inhalte sind auf Englisch verfügbar. Maßgeblich ist der Originaltext der Bekanntmachung.
LOCATION ET MAINTENANCE DE DIVERS MATERIELS DE MANUTENTION ELECTRIQUES (SITE DE MAROLLES 51300)
Santé publique France
Marne
20. Nov. 2026
18. Okt. 2026
To win this one
- The stakes: Enjeu observé : 639 681 € (médiane du métier, 169 marchés), 3 offres attendues (médiane du métier, 117 marchés) ; environ 213 227 € espérés, ordre de grandeur, pas un devis.
- The clock: 2 days: bid only if your administrative documents are already in hand; a proposal gets finished in that time, not started.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- CABLES ET CIE won « LOCATION DE MATERIELS ELECTRIQUES » with Ville de Nîmes (30) (Gard) : 20/10/2026
- Evenelec won « Location, pose et dépose de matériel électrique lors des manifestations » with Spl Gayant (Nord) : 640 000 €, 06/10/2026
- SOVEC ENTREPRISES won « Maintenance des installations électriques à l'Hôtel d'Alsace Strasbourg » with Collectivité européenne d Alsace (Bas-Rhin) : 144 000 €, 30/10/2026
- SONEPAR FRANCE DISTRIBUTION, WILLY LEISSNER won « Fourniture de matériels électriques et d'éclairages » with Ville de Woippy (Moselle) : 9 451 €, 6 bids, 05/11/2026
- LEGALLAIS, COMPTOIR ELECTRIQUE FRANCAIS won « Fourniture de matériels électriques et de plomberie » with Ca Béthune-Bruay Artois Lys Romane (Pas-de-Calais) : 14/10/2026
Across these 5 contracts: median amount €144,000 (3 published) ; median of 6 bids (1 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 20 novembre 2026, in 2 days.
- Up to 200 suppliers may be selected: first place is not the only one that counts, but the number actually selected depends on the bids received and the rules.
- A single lot: the contract is taken whole or not at all.
- Duration: 48 months (4 ans).
- environmental criteria are scored. That is where a local firm earns points a large group does not.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution), the estimated value. These are in the consultation rules inside the tender file.
marchespublics@santepubliquefrance.fr 0141796920
How many rivals you actually face
sur l'ensemble des marchés français, la médiane est de 3 offres par lot. 55 % des lots en reçoivent trois ou moins, et seulement 9 % dépassent dix candidats.
67 % des offres viennent de PME, et dans 20 % des lots aucune PME n'a candidaté.
Stakes: Enjeu observé : 639 681 € (médiane du métier, 169 marchés), 3 offres attendues (médiane du métier, 117 marchés) ; environ 213 227 € espérés, ordre de grandeur, pas un devis.
Measured on 4333 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-100834.