Unele materiale sunt disponibile în engleză. Textul original al anunțului este cel de referință.
Maîtrise d'œuvre relative à la modernisation du canal du midi concernant l'instrumentation et la navigation - phase étude et travaux
VNF DTSO
Haute-Garonne
24 nov. 2026
24 oct. 2026
Tender file pre-read
Upload the tender file: Tendveo picks out the submission deadline, site visit, minimum turnover, qualifications, technical requirements and contract clauses, each with the sentence of the document it comes from. An automatic reading to check, not legal advice.
To win this one
- The price: Prix observés dans ce département (11 marchés attribués de ce métier) : un quart sous 337 945 €, médiane 600 000 €, trois quarts sous 1 895 463 € ; montants publiés, souvent des maxima d'accord-cadre.
- The stakes: Enjeu observé : 317 865 € (médiane du métier, 376 marchés), 5 offres attendues (médiane du métier, 259 marchés) ; environ 63 573 € espérés, ordre de grandeur, pas un devis.
- The clock: 4 days: bid only if your administrative documents are already in hand; a proposal gets finished in that time, not started.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- TBM ENVIRONNEMENT, SYNERGIS ENVIRONNEMENT won « Accord-cadre à bons de commande pour les études environnementales, missions de maîtrise d'oeuvre et dossiers d » with Conseil Départemental du Morbihan (Morbihan) : 1 400 000 €, 11 bids, 22/09/2026
- ATOME, GIE DARWIN CONCEPT won « Accord-cadre d'Etudes et de Maîtrise d'OEuvre pour travaux sur les installations électriques » with GRAND PORT MARITIME DE LA REUNION (La Réunion) : 356 975 €, 6 bids, 18/10/2026
- CDC CONSEIL, SCOPING won « MARCHE DE MISSION DE MAITRISE D'OEUVRE ET D'OPC CONCERNANT LA RENOVATION ENERGETIQUE DE L'UIOSS DE LOIR-ET-CHE » with UIOSS Loir-et-Cher (Loir-et-Cher) : 259 500 €, 5 bids, 02/10/2026
- CRR ARCHITECTURE (Architecte mandataire du groupement) won « Marché de maîtrise d'oeuvre pour le projet d'extension et de modernisation du Centre Hospitalier de Toul » with 54 CHRU (Meurthe-et-Moselle) : 4 bids, 14/09/2026
- SOCIETE POUR LA REALISATION D'EQUIPEMENTS ET DE CONSTRUCTIONS won « Missions de Maîtrise d’oeuvre pour l'étude et la conduite de travaux d’aménagement d’espaces publics de voirie » with Mairie de Suresnes (Hauts-de-Seine) : 240 000 €, 11 bids, 19/11/2026
Across these 5 contracts: median amount €308,238 (4 published) ; median of 6 bids (5 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 24 novembre 2026, in 4 days.
- Confirm the submission time or time zone on the buyer's platform.
- A single supplier will be selected. All or nothing.
- A single lot: the contract is taken whole or not at all.
- Duration: 48 months (4 ans).
- Estimated value: 925 000 €.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas son critère de prix). These are in the consultation rules inside the tender file.
isabelle.allasia@vnf.fr +33 624554658
How many rivals you actually face
sur les marchés « Ingénierie », la médiane est de 5 offres par lot. 32 % des lots en reçoivent trois ou moins, et seulement 19 % dépassent dix candidats.
72 % des offres viennent de PME.
Stakes: Enjeu observé : 317 865 € (médiane du métier, 376 marchés), 5 offres attendues (médiane du métier, 259 marchés) ; environ 63 573 € espérés, ordre de grandeur, pas un devis.
Measured on 31 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-102895.