Maîtrise d'œuvre relative à la modernisation du canal du midi concernant l'instrumentation et la navigation - phase étude et travaux
VNF DTSO
Haute-Garonne
24 Nov 2026
24 Oct 2026
Tender file pre-read
Upload the tender file: Tendveo picks out the submission deadline, site visit, minimum turnover, qualifications, technical requirements and contract clauses, each with the sentence of the document it comes from. An automatic reading to check, not legal advice.
To win this one
- The price: Observed prices in this département (11 awarded contracts in this trade): a quarter under €337,945, median €600,000, three quarters under €1,895,463; published amounts, often framework maxima.
- The stakes: Observed value: €317,865 (trade median, 376 contracts), 5 expected bids (trade median, 259 contracts); about €63,573 expected, an order of magnitude, not a quote.
- The clock: 4 days: bid only if your administrative documents are already in hand; a proposal gets finished in that time, not started.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- TBM ENVIRONNEMENT, SYNERGIS ENVIRONNEMENT won « Accord-cadre à bons de commande pour les études environnementales, missions de maîtrise d'oeuvre et dossiers d » with Conseil Départemental du Morbihan (Morbihan) : €1,400,000, 11 bids, 22/09/2026
- ATOME, GIE DARWIN CONCEPT won « Accord-cadre d'Etudes et de Maîtrise d'OEuvre pour travaux sur les installations électriques » with GRAND PORT MARITIME DE LA REUNION (La Réunion) : €356,975, 6 bids, 18/10/2026
- CDC CONSEIL, SCOPING won « MARCHE DE MISSION DE MAITRISE D'OEUVRE ET D'OPC CONCERNANT LA RENOVATION ENERGETIQUE DE L'UIOSS DE LOIR-ET-CHE » with UIOSS Loir-et-Cher (Loir-et-Cher) : €259,500, 5 bids, 02/10/2026
- CRR ARCHITECTURE (Architecte mandataire du groupement) won « Marché de maîtrise d'oeuvre pour le projet d'extension et de modernisation du Centre Hospitalier de Toul » with 54 CHRU (Meurthe-et-Moselle) : 4 bids, 14/09/2026
- SOCIETE POUR LA REALISATION D'EQUIPEMENTS ET DE CONSTRUCTIONS won « Missions de Maîtrise d’oeuvre pour l'étude et la conduite de travaux d’aménagement d’espaces publics de voirie » with Mairie de Suresnes (Hauts-de-Seine) : €240,000, 11 bids, 19/11/2026
Across these 5 contracts: median amount €308,238 (4 published) ; median of 6 bids (5 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 24 November 2026, in 4 days.
- Confirm the submission time or time zone on the buyer's platform.
- A single supplier will be selected. All or nothing.
- A single lot: the contract is taken whole or not at all.
- Duration: 48 months (4 ans).
- Estimated value: 925 000 €.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas son critère de prix). These are in the consultation rules inside the tender file.
isabelle.allasia@vnf.fr +33 624554658
How many rivals you actually face
on "Ingénierie" contracts, the median is 5 bids per lot; 32% of lots get three or fewer, and only 19% get more than ten.
72% of the bids come from SMEs.
Stakes: Observed value: €317,865 (trade median, 376 contracts), 5 expected bids (trade median, 259 contracts); about €63,573 expected, an order of magnitude, not a quote.
Measured on 31 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-102895.