Einige Inhalte sind auf Englisch verfügbar. Maßgeblich ist der Originaltext der Bekanntmachung.
Entretien et la maintenance des installations d’éclairage de sécurité (BAES) des bâtiments de l’Université Gustave Eiffel, Campus de Marne-La-Vallée et Campus de Versailles.
UNIVERSITE GUSTAVE EIFFEL
Seine-et-Marne
23. Nov. 2026
24. Okt. 2026
To win this one
- The stakes: Enjeu observé : 524 048 € (médiane du métier, 306 marchés), 3 offres attendues (médiane du métier, 197 marchés) ; environ 174 683 € espérés, ordre de grandeur, pas un devis.
- The clock: 6 days: bid only if your administrative documents are already in hand; a proposal gets finished in that time, not started.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- CONSTRUCTION MODERNE IDF, CUILLER FRERES won « Travaux de construction du bâtiment universitaire "Première Pierre" pour l?Université Paris Est Marne-la-Vallé » with Région Ile de France (Seine-et-Marne) : 2 935 987 €, 11/11/2026
- SEG FAYAT, SOPREMA ENTREPRISES won « Travaux de construction des bâtiments B19a (SIREAUCO Pessac) et B19b (INSPE) sur le campus Bordes de l’univers » with UNIVERSITE DE BORDEAUX (Gironde) : 4 450 000 €, 13/09/2026
- CRUARD Charpente et Construction Bois SAS, LES MENUISERIES BOURNEUF won « Travaux de construction des bâtiments B19a (SIREAUCO Pessac) et B19b (INSPE) sur le campus Bordes de l’univers » with UNIVERSITE DE BORDEAUX (Gironde) : 2 336 692 €, 13/09/2026
- EIFFAGE CONSTRUCTION MIDI PYRENEES won « MARCHÉ PUBLIC DE CONCEPTION / REALISATION POUR LA REHABILITATION ET L'AMELIORATION ENERGETIQUE DE LA RESIDENCE » with CROUS de Toulouse-Occitanie (Haute-Garonne) : 5 399 000 €, 3 bids, 01/10/2026
- ECLISS won « Accord-cadre portant sur la maintenance des dispositifs de détection de gaz de l’ensemble des bâtiments de l’U » with UNIVERSITE BOURGOGNE EUROPE (Côte-d'Or) : 29/10/2026
Across these 5 contracts: median amount €3,692,994 (4 published) ; median of 3 bids (1 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 23 novembre 2026, in 6 days.
- A single lot: the contract is taken whole or not at all.
- Duration: 12 months.
- environmental criteria are scored. That is where a local firm earns points a large group does not.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution), the estimated value. These are in the consultation rules inside the tender file.
marchespublics@univ-eiffel.fr +33181668310
How many rivals you actually face
sur les marchés « Maintenance », la médiane est de 2 offres par lot. 74 % des lots en reçoivent trois ou moins, et seulement 2 % dépassent dix candidats.
51 % des offres viennent de PME, et dans 33 % des lots aucune PME n'a candidaté.
Stakes: Enjeu observé : 524 048 € (médiane du métier, 306 marchés), 3 offres attendues (médiane du métier, 197 marchés) ; environ 174 683 € espérés, ordre de grandeur, pas un devis.
Measured on 114 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-102966.