Concours restreint de maîtrise d'Oeuvre sur ESQUISSE PLUS pour la construction d'une brigade de Gendarmerie à POLLIAT (01) - Stade Candidatures
IN TERRA
Ain
30/11/2026
25/10/2026
Tender file pre-read
Upload the tender file: Tendveo picks out the submission deadline, site visit, minimum turnover, qualifications, technical requirements and contract clauses, each with the sentence of the document it comes from. An automatic reading to check, not legal advice.
To win this one
- The price: Ordre de grandeur du métier en France (376 marchés attribués de ce métier) : un quart sous 153 543 €, médiane 317 865 €, trois quarts sous 740 267 € ; montants publiés, souvent des maxima d'accord-cadre.
- The stakes: Enjeu observé : 317 865 € (médiane du métier, 376 marchés), 5 offres attendues (médiane du métier, 259 marchés) ; environ 63 573 € espérés, ordre de grandeur, pas un devis.
- The clock: 10 days: start this week, site visit or questions to the buyer before the end of week one.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- SARL GBL ARCHITECTES, Egis Bâtiments Nord-Est won « CONCOURS RESTREINT DE MAITRISE D'OEUVRE SUR ESQUISSE POUR LA CONSTRUCTION D'UNE CUISINE CENTRALE - Phase 1 - C » with Mairie de Lesquin (Nord) : 23/10/2026
- ATELIERS 2/3/4/ (Mandataire) won « CONCOURS RESTREINT DE MAÎTRISE D’ŒUVRE SUR ESQUISSE+ POUR LA CASERNE DELORT A HYÈRES (83) » with SGAMI SUD (Var) : 3 bids, 20/10/2026
- Groupement LEMOAL&LEMOAL ARCHI/SODEBA-GINKO/LINK ACOUSTIQUE won « Concours restreint de maîtrise d'oeuvre sur esquisse + pour la construction d'un groupe scolaire sur la commun » with S.I.A.B.A (Aube) : 345 755 €, 46 bids, 10/11/2026
- REC ARCHITECTURE won « CONCOURS RESTREINT DE MAITRISE D'OEUVRE SUR ESQUISSE POUR LA RESTRUCTURATION ET L'EXTENSION DE LA CUISINE CENT » with COMMUNE DE SAINT JORY (Haute-Garonne) : 26 bids, 06/10/2026
- COCO ARCHITECTURE won « Concours restreint de maîtrise d’œuvre sur ESQUISSE pour la Réhabilitation et l’extension de l’IFPS du Centre » with CHU CAEN (Calvados) : 844 800 €, 18/09/2026
Across these 5 contracts: median amount €595,278 (2 published) ; median of 26 bids (3 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 30 novembre 2026, in 10 days.
- Confirm the submission time or time zone on the buyer's platform.
- A single lot: the contract is taken whole or not at all.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution), the contract duration, the estimated value. These are in the consultation rules inside the tender file.
g.favre@interra-spl.fr +33 474256236
How many rivals you actually face
sur les marchés « Maîtrise d'oeuvre », la médiane est de 5 offres par lot. 38 % des lots en reçoivent trois ou moins, et seulement 26 % dépassent dix candidats.
77 % des offres viennent de PME, et dans 21 % des lots aucune PME n'a candidaté.
Stakes: Enjeu observé : 317 865 € (médiane du métier, 376 marchés), 5 offres attendues (médiane du métier, 259 marchés) ; environ 63 573 € espérés, ordre de grandeur, pas un devis.
Measured on 84 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-103429.