Einige Inhalte sind auf Englisch verfügbar. Maßgeblich ist der Originaltext der Bekanntmachung.

Bâtiment & gros œuvrein 6 TagenProcédure adaptée (attribution possible sans négociation)

Marchés de travaux pour la réhabilitation des "Travaux autres" de la Résidence du Crous Puvis de Chavanne à Villeurbanne (69)

Buyer

Semcoda au nom et pour le compte du Crous De Lyon

Location

Rhône

Deadline

23. Nov. 2026

in 6 Tagen
Published

27. Okt. 2026

Open the notice & tender file ↗ Read the expert study (in French) Download the bid file (ZIP, in French)

Bid file for one lot: lot 1 lot 2 lot 3 lot 4 lot 5 lot 6 lot 7 lot 8

To win this one

  • The stakes: Enjeu observé : 524 048 € (médiane du métier, 306 marchés), 3 offres attendues (médiane du métier, 197 marchés) ; environ 174 683 € espérés, ordre de grandeur, pas un devis.
  • The clock: 6 days: bid only if your administrative documents are already in hand; a proposal gets finished in that time, not started.

Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.

Who won similar contracts

  • GAGNERAUD, L.RENAULT won « Marché de travaux de réhabilitation du bâtiment Jehan ANGO de la Résidence Panorama, Site de Mont Saint Aigna » with CROUS Normandie (Seine-Maritime) : 629 948 €, 04/11/2026
  • ENTREPRISE BOURDARIOS, LAGREZE & LACROUX won « Marché public de travaux pour la REHABILITATION de la Résidence NOBEL - 36 Place du 19 Mars 1962 - ALBI (81) » with CROUS de Toulouse-Occitanie (Haute-Garonne) : 477 698 €, 3 bids, 20/10/2026
  • INGENIERIE ET CONSTRUCTION SAS won « Marché public de prestations intellectuelles d’ordonnancement, de pilotage et de coordination pour la construc » with CROUS Normandie (Seine-Maritime) : 53 200 €, 13/11/2026
  • EIFFAGE CONSTRUCTION MIDI PYRENEES won « MARCHÉ PUBLIC DE CONCEPTION / REALISATION POUR LA REHABILITATION ET L'AMELIORATION ENERGETIQUE DE LA RESIDENCE » with CROUS de Toulouse-Occitanie (Haute-Garonne) : 5 399 000 €, 3 bids, 01/10/2026
  • TK ELEVATOR FRANCE, GROUPE EMILE DUFOUR won « TRAVAUX DE REHABILITATION DU THEATRE DE LA NACELLE A AUBERGENVILLE » with CU Grand Paris Seine & Oise (Yvelines) : 25 000 €, 6 bids, 16/10/2026

Across these 5 contracts: median amount €477,698 (5 published) ; median of 3 bids (3 published).

Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.

The essentials, in thirty seconds

Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.

  • Bids due on 23 novembre 2026, in 6 days.
  • The contract is split into 8 lots. You may bid on the one that fits you only.
  • Duration: 4 months.
  • environmental criteria are scored. That is where a local firm earns points a large group does not.

The notice does not state : the question deadline, the score breakdown (critères renvoyés au règlement de la consultation (« énoncé dans le Rc »)), the estimated value. These are in the consultation rules inside the tender file.

Open the tender file

How many rivals you actually face

sur les marchés « Bâtiment », la médiane est de 4 offres par lot. 34 % des lots en reçoivent trois ou moins, et seulement 6 % dépassent dix candidats.

4bids per lot, median
5%of lots get a single bidder
34%of lots get 3 bidders or fewer

87 % des offres viennent de PME.

Stakes: Enjeu observé : 524 048 € (médiane du métier, 306 marchés), 3 offres attendues (médiane du métier, 197 marchés) ; environ 174 683 € espérés, ordre de grandeur, pas un devis.

Measured on 253 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.

Run your radar to see how well this contract fits you, and get the next ones automatically. Mein Gewerbe beschreiben →

Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-104545.