Alguns conteúdos estão disponíveis em inglês. O texto original do anúncio é a referência.
Maintenance des onduleurs pour les établissements du Ght Savoie-Belley
Ght Savoie Belley - Ch Métropole Savoie
Savoie
20/11/2026
29/10/2026
Bid file for one lot: lot 1 lot 2 lot 3 lot 4 lot 5 lot 6
To win this one
- The stakes: Enjeu observé : 510 000 € (médiane du métier, 174 marchés), 3 offres attendues (médiane du métier, 113 marchés) ; environ 170 000 € espérés, ordre de grandeur, pas un devis.
- The clock: 3 days: bid only if your administrative documents are already in hand; a proposal gets finished in that time, not started.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- ASKCO, ENERIA won « Maintenance des onduleurs et groupes électrogènes de l'EFS Nouvelle-Aquitaine » with EFS NOUVELLE-AQUITAINE (Gironde) : 7 850 €, 4 bids, 11/09/2026
- CAP ENERGIE TELECOM won « Accord-cadre exécuté par l’émission de bons de commande pour maintenance préventive et corrective des groupes » with Direction d'Infrastructure de la Défense de Saint-Denis (DID SDS) (La Réunion) : 609 147 €, 11/10/2026
- AIR LIQUIDE SANTE FRANCE won « MAINTENANCE DES INSTALLATIONS FIXES DE FLUIDES MEDICAUX DU GHT SUD BRETAGNE » with Groupe Hospitalier Bretagne Sud (Morbihan) : 720 000 €, 2 bids, 08/11/2026
Across these 3 contracts: median amount €609,147 (3 published) ; median of 3 bids (2 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 20 novembre 2026, in 3 days.
- The contract is split into 6 lots. You may bid on the one that fits you only.
- Duration: 48 months (4 ans).
- environmental criteria are scored. That is where a local firm earns points a large group does not.
The notice does not state : the question deadline, the score breakdown (critères renvoyés au règlement de la consultation (« énoncé dans le Rc »)), the estimated value. These are in the consultation rules inside the tender file.
+33 479965675
How many rivals you actually face
sur les marchés « Maintenance », la médiane est de 2 offres par lot. 74 % des lots en reçoivent trois ou moins, et seulement 2 % dépassent dix candidats.
51 % des offres viennent de PME, et dans 33 % des lots aucune PME n'a candidaté.
Stakes: Enjeu observé : 510 000 € (médiane du métier, 174 marchés), 3 offres attendues (médiane du métier, 113 marchés) ; environ 170 000 € espérés, ordre de grandeur, pas un devis.
Measured on 114 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-105311.