Travaux d'extension de l'atelier de carrosserie du centre de formation Purple Campus de Béziers - Relance consultation précédente 21her01l
Chambre de Commerce et d'Industrie de l'Hérault
Hérault
26. Nov. 2026
30. Okt. 2026
Bid file for one lot: lot 1 lot 2 lot 3 lot 4 lot 5 lot 6 lot 7
To win this one
- The stakes: Enjeu observé : 524 048 € (médiane du métier, 306 marchés), 3 offres attendues (médiane du métier, 197 marchés) ; environ 174 683 € espérés, ordre de grandeur, pas un devis.
- The clock: 9 days: start this week, site visit or questions to the buyer before the end of week one.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- CRUARD Charpente et Construction Bois SAS, LES MENUISERIES BOURNEUF won « Travaux de construction des bâtiments B19a (SIREAUCO Pessac) et B19b (INSPE) sur le campus Bordes de l’univers » with UNIVERSITE DE BORDEAUX (Gironde) : 2 336 692 €, 13/09/2026
- CSA won « Relance lot 18 : PLOMBERIE/CHAUFFAGE/VENTILATION Extension et réhabilitation des bâtiments B1, B4, B5, B6, B7 » with BATIMENT CFA BRETAGNE (Ille-et-Vilaine) : 1 129 726 €, 11/11/2026
- ETS MANENT ET FILS, QUALIT'R won « Travaux de Rénovation et d’extension du centre de réhabilitation respiratoire Filieris de Folcheran » with CANSSM (Ardèche) : 214 645 €, 24/09/2026
- ERTCM INDUSTRIES, DUFRAIGNE COUVERTURE won « PANOPTIQUE D’AUTUN, RENOVATION ET EXTENSION DU MUSEE ROLIN TRANCHE OPERATIONNELLE 1 (TO1) - (relance des lots » with Ville d'Autun (Saône-et-Loire) : 932 253 €, 08/11/2026
- PICARDIE ENVIRONNEMENT, SARL VITSE won « Affaire n°26TE0047 - Extension de la MAS « La Pommeraie » (relance) » with CHU AMIENS PICARDIE (Somme) : 455 890 €, 01/11/2026
Across these 5 contracts: median amount €932,253 (5 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- The buyer is relaunching a consultation that failed: the previous round produced no acceptable bid. This is the kind of contract where the field is empty, and they are rare.
- Bids due on 26 novembre 2026, in 9 days.
- The contract is split into 7 lots. You may bid on the one that fits you only.
- Duration: 4 months.
- Estimated value: 350 000 €.
The notice does not state : the question deadline, the score breakdown (critères renvoyés au règlement de la consultation (« énoncé dans le Rc »)). These are in the consultation rules inside the tender file.
+33 640642561
How many rivals you actually face
sur les marchés « Bâtiment », la médiane est de 4 offres par lot. 34 % des lots en reçoivent trois ou moins, et seulement 6 % dépassent dix candidats.
87 % des offres viennent de PME.
Stakes: Enjeu observé : 524 048 € (médiane du métier, 306 marchés), 3 offres attendues (médiane du métier, 197 marchés) ; environ 174 683 € espérés, ordre de grandeur, pas un devis.
Measured on 253 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-105767.