Einige Inhalte sind auf Englisch verfügbar. Maßgeblich ist der Originaltext der Bekanntmachung.
Travaux de réhabilitation de 10 immeubles (80 logements collectifs) rue du Docteur SEGUIN et rue HENRI SAINT PIERRE à ROUEN (76) LOT UNIQUE : PRODUCTION ECS ELECTRIQUE
ROUEN HABITAT
Seine-Maritime
18. Nov. 2026
03. Nov. 2026
To win this one
- The stakes: Enjeu observé : 639 681 € (médiane du métier, 169 marchés), 3 offres attendues (médiane du métier, 117 marchés) ; environ 213 227 € espérés, ordre de grandeur, pas un devis.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- CEFF won « Travaux de maintenance électrique des infrastructures maritimes et fluviales » with Département de la Seine-Maritime (Seine-Maritime) : 2 800 000 €, 3 bids, 29/10/2026
- IDEX ENERGIES won « Marché d'exploitation des installations de chauffage, de production ECS, de ventilation, de climatisation et d » with ville de Le Vésinet (Yvelines) : 103 777 €, 07/10/2026
- Entreprise TASKIN won « Accord-cadre à bons de commande de travaux d'entretien courant et de remise en état des logements sur le patri » with ADVIVO (Isère) : 3 000 000 €, 5 bids, 17/11/2026
- FACEO FM NOUVELLE AQUITAINE - VINCI FACILITIES CHARENTES won « ACBC relatif à l'exploitation, la maintenance des installations de CVC, de production ECS; de la plomberie san » with SID-SO (Charente-Maritime) : 2 522 112 €, 06/10/2026
- COLAS FRANCE -Etablissement Côte d'Opale, EPM GAS TECHNOLOGY FRANCE won « Travaux de rénovation de la station GNV et ajout d'emplacements de recharge pour bus électriques » with Communauté d'agglomération du Boulonnais (Pas-de-Calais) : 244 994 €, 8 bids, 04/11/2026
Across these 5 contracts: median amount €2,522,112 (5 published) ; median of 5 bids (3 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- The submission deadline has passed: do not prepare a submission for this notice.
- environmental criteria are scored. That is where a local firm earns points a large group does not.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution), the contract duration, the estimated value. These are in the consultation rules inside the tender file.
marine.algret@rouenhabitat.fr +33 235156161
How many rivals you actually face
sur l'ensemble des marchés français, la médiane est de 3 offres par lot. 55 % des lots en reçoivent trois ou moins, et seulement 9 % dépassent dix candidats.
67 % des offres viennent de PME, et dans 20 % des lots aucune PME n'a candidaté.
Stakes: Enjeu observé : 639 681 € (médiane du métier, 169 marchés), 3 offres attendues (médiane du métier, 117 marchés) ; environ 213 227 € espérés, ordre de grandeur, pas un devis.
Measured on 4333 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-106524.