Einige Inhalte sind auf Englisch verfügbar. Maßgeblich ist der Originaltext der Bekanntmachung.

Bâtiment & gros œuvreDatum prüfenProcédure adaptée (attribution possible sans négociation)

Restructuration du bâtiment SEGPA au collège Boueni MTITI, Relance du lot n°9 : Équipement de cuisine

Buyer

RECT- 976

Location

Mayotte

Deadline

17. Nov. 2026

Published

03. Nov. 2026

Open the notice & tender file ↗ Read the expert study (in French) Download the bid file (ZIP, in French)

To win this one

  • The stakes: Enjeu observé : 524 048 € (médiane du métier, 306 marchés), 3 offres attendues (médiane du métier, 197 marchés) ; environ 174 683 € espérés, ordre de grandeur, pas un devis.

Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.

Who won similar contracts

  • LOCACONCEPT SAS won « FOURNITURE ET LOCATION DE MODULES PROVISOIRES POUR LES TRAVAUX DE RESTRUCTURATION DES CUISINES DU COLLÈGE JEAN » with Département des Landes (Landes) : 418 293 €, 08/11/2026
  • CUISINE SERVICE, DUBOIS SAS won « Accord-cadre pour l'acquisition des équipements de cuisine pour les bâtiments du Département de l'Aisne » with DAFAP - Service de l'Achat Public (Aisne) : 280 000 €, 15/10/2026
  • SARL LARUE BRUNO won « RESTRUCTURATION GLOBALE AVEC EXTENSION AU COLLEGE RENE CASSIN A PARAY-LE-MONIAL » with DEPARTEMENT DE SAONE ET LOIRE (Saône-et-Loire) : 1 442 501 €, 29/10/2026
  • PRO AMIANTE, THOMAS ET FILS won « RESTRUCTURATION GLOBALE AVEC EXTENSION AU COLLEGE RENE CASSIN A PARAY-LE-MONIAL » with DEPARTEMENT DE SAONE ET LOIRE (Saône-et-Loire) : 115 295 €, 15/09/2026
  • CHOLET TP SAS, SASU ID VERDE won « Travaux de restructuration du collège Joachim du Bellay à Cholet » with DEPARTEMENT DU MAINE ET LOIRE (Maine-et-Loire) : 253 981 €, 08/11/2026

Across these 5 contracts: median amount €280,000 (5 published).

Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.

The essentials, in thirty seconds

Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.

  • The buyer is relaunching a consultation that failed: the previous round produced no acceptable bid. This is the kind of contract where the field is empty, and they are rare.
  • Bids due on 17 novembre 2026.
  • Confirm the submission time or time zone on the buyer's platform.
  • Duration: 11 months.
  • Estimated value: 126 000 €.
  • environmental criteria are scored. That is where a local firm earns points a large group does not.

The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution). These are in the consultation rules inside the tender file.

Ask the buyer a question

nadoum.aboubacar-ben-ali@ac-mayotte.fr

Open the tender file

How many rivals you actually face

sur les marchés « Cuisine (équipement) », la médiane est de 3 offres par lot. 62 % des lots en reçoivent trois ou moins, et seulement 0 % dépassent dix candidats.

3bids per lot, median
23%of lots get a single bidder
62%of lots get 3 bidders or fewer

100 % des offres viennent de PME.

Stakes: Enjeu observé : 524 048 € (médiane du métier, 306 marchés), 3 offres attendues (médiane du métier, 197 marchés) ; environ 174 683 € espérés, ordre de grandeur, pas un devis.

Measured on 13 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.

Run your radar to see how well this contract fits you, and get the next ones automatically. Mein Gewerbe beschreiben →

Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-106815.