Einige Inhalte sind auf Englisch verfügbar. Maßgeblich ist der Originaltext der Bekanntmachung.
ACCORD CADRE 1-2026 - Acheminement et fourniture d’électricité Marché de Fournitures Courantes et Services - BORNE IRVE
Syndicat Départemental d'Energie du Finistère
Finistère
18. Dez. 2026
19. Nov. 2026
Tender file pre-read
Upload the tender file: Tendveo picks out the submission deadline, site visit, minimum turnover, qualifications, technical requirements and contract clauses, each with the sentence of the document it comes from. An automatic reading to check, not legal advice.
To win this one
- The score: La technique pèse 95 % de la note. Casser votre prix ne servira à rien ici : c'est le mémoire qui décide.
- The stakes: Enjeu observé : 639 681 € (médiane du métier, 175 marchés), 3 offres attendues (médiane du métier, 120 marchés) ; environ 213 227 € espérés, ordre de grandeur, pas un devis.
- The clock: 29 days: time to question the buyer, visit, and write a tailored proposal.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- Waat won « Bornes » with Caisse des dépôts et consignations (Paris) : 7 300 000 €, 10/11/2026
- SPIE BATIGNOLLES ENERGIE won « Travaux de courants faibles et de courants forts de l'EPML » with MUSEE DU LOUVRE (Paris) : 8 000 000 €, 22/10/2026
- ZEPHYR ENERGIES RENOUVEABLES won « la fourniture et l'acheminement d'électricité pour 48 points de livraison communaux » with Commune de Bonnétable (Sarthe) : 105 352 €, 3 bids, 11/11/2026
- ENGIE SA, VOLTERRES won « Fourniture et l’acheminement d’électricité pour les membres de son groupement de commandes. » with MULHOUSE ALSACE AGGLOMERATION (Haut-Rhin) : 65 429 256 €, 28/10/2026
- ENGIE won « FOURNITURE ET ACHEMINEMENT D'ELECTRICITE - Marché Subséquent N° 2 (du 01/01/2027 au 31/12/2027) » with Ville d'Escautpont (Nord) : 188 232 €, 16/10/2026
Across these 5 contracts: median amount €7,300,000 (5 published) ; median of 3 bids (1 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 18 décembre 2026, in 29 days.
- Confirm the submission time or time zone on the buyer's platform.
- A single lot: the contract is taken whole or not at all.
- La technique pèse 95 % de la note. Casser votre prix ne servira à rien ici : c'est le mémoire qui décide.
- environmental criteria are scored. That is where a local firm earns points a large group does not.
The notice does not state : the question deadline, the contract duration, the estimated value. These are in the consultation rules inside the tender file.
servicejuridique@sdef.fr +33 298103636
How this buyer will score
La technique pèse 95 % de la note. Casser votre prix ne servira à rien ici : c'est le mémoire qui décide.
- 85% Valeur Technique sur 85%. Voir le détail dans le règlement de consultation…
- 10% Valeur environnementale sur 10% Voir le détail dans le règlement de consultation…
- 5% Valeur prix au stade de l'accord cadre sur 5% Voir le détail dans le règlement…de consultation article 6
How many rivals you actually face
sur les marchés « Electricité, gaz (fourniture) », la médiane est de 4 offres par lot. 29 % des lots en reçoivent trois ou moins, et seulement 0 % dépassent dix candidats.
21 % des offres viennent de PME.
Stakes: Enjeu observé : 639 681 € (médiane du métier, 175 marchés), 3 offres attendues (médiane du métier, 120 marchés) ; environ 213 227 € espérés, ordre de grandeur, pas un devis.
Measured on 17 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-111839.