Alguns conteúdos estão disponíveis em inglês. O texto original do anúncio é a referência.
Remplacement du système d’éclairage HT (haute tension) des façades de l’UBM par une solution LED.
CHU DE POITIERS
Vienne
17/12/2026
19/11/2026
Tender file pre-read
Upload the tender file: Tendveo picks out the submission deadline, site visit, minimum turnover, qualifications, technical requirements and contract clauses, each with the sentence of the document it comes from. An automatic reading to check, not legal advice.
To win this one
- The stakes: Enjeu observé : 639 681 € (médiane du métier, 175 marchés), 3 offres attendues (médiane du métier, 120 marchés) ; environ 213 227 € espérés, ordre de grandeur, pas un devis.
- The clock: 27 days: time to question the buyer, visit, and write a tailored proposal.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- MADINE ELECTROSERVICES won « MAINTENANCE DES INSTALLATIONS ELECTRIQUES HAUTE TENSION ET BASSE TENSION » with GROUPE HOSPITALIER SAINTES - SAINT-JEAN D'ANGELY, Ets support GHT Charente-Maritime Sud (Charente-Maritime) : 258 676 €, 23/09/2026
- SOVEC ENTREPRISES won « Exploitation et maintenance des installations électriques basse tension et haute tension des sites de la CARSA » with CARSAT ALSACE MOSELLE (Bas-Rhin) : 07/11/2026
- Groupement conjoint GIORGI (Mandataire)/SE2M Industres won « Istres (13) - Accord-cadre relatif aux travaux sur les installations de distribution et de production d’énergi » with SID Sud-Est (Bouches-du-Rhône) : 500 000 €, 18/09/2026
- SIGNIFY FRANCE SAS won « Acquisition d'un système RF Mesh pour la télégestion individuelle des points lumineux » with Commune de Talence (Gironde) : 500 000 €, 25/10/2026
- ATTA won « Guyane (973), FAG, Tous sites, Accord-cadre mixte portant sur la réalisation d’études et d’AMO pour les ins » with DID CAYENNE (Guyane) : 3 bids, 16/09/2026
Across these 5 contracts: median amount €500,000 (3 published) ; median of 3 bids (1 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 17 décembre 2026, in 27 days.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution), the contract duration, the estimated value. These are in the consultation rules inside the tender file.
How many rivals you actually face
sur les marchés « Electricité (travaux) », la médiane est de 5 offres par lot. 29 % des lots en reçoivent trois ou moins, et seulement 9 % dépassent dix candidats.
85 % des offres viennent de PME.
Stakes: Enjeu observé : 639 681 € (médiane du métier, 175 marchés), 3 offres attendues (médiane du métier, 120 marchés) ; environ 213 227 € espérés, ordre de grandeur, pas un devis.
Measured on 116 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-112324.