Alguns conteúdos estão disponíveis em inglês. O texto original do anúncio é a referência.
Travaux de restructuration du CMP de Coutances
FONDATION BON SAUVEUR DE LA MANCHE
Manche
10/12/2026
19/11/2026
Bid file for one lot: lot 1 lot 2 lot 3 lot 4 lot 5 lot 6 lot 7 lot 8 lot 9
Technical proposal per lot (one draft per lot): Proposal for lot 1 Proposal for lot 2 Proposal for lot 3 Proposal for lot 4 Proposal for lot 5 Proposal for lot 6 Proposal for lot 7 Proposal for lot 8 Proposal for lot 9
Tender file pre-read
Upload the tender file: Tendveo picks out the submission deadline, site visit, minimum turnover, qualifications, technical requirements and contract clauses, each with the sentence of the document it comes from. An automatic reading to check, not legal advice.
To win this one
- The stakes: Enjeu observé : 639 681 € (médiane du métier, 175 marchés), 3 offres attendues (médiane du métier, 120 marchés) ; environ 213 227 € espérés, ordre de grandeur, pas un devis.
- The clock: 20 days: start this week, site visit or questions to the buyer before the end of week one.
Each line comes from a published measure (the notice's grid, awards, the buyer's history). A missing line means the data is missing, not that it is favourable.
Who won similar contracts
- ENTREPRISE GENERALE LEON GROSSE, E.B.C.I won « Opération de travaux pour la restructuration et l’extension des ailes C, C’ et D... » with GHPSO (Nord) : 4 762 895 €, 04/11/2026
- VIANO BTP, APSM won « Travaux de restructuration du Collège Honoré de Balzac de Saint Amand Longpré » with Département du Loir-et-Cher (Loir-et-Cher) : 2 467 623 €, 2 bids, 25/09/2026
Across these 2 contracts: median amount €3,615,259 (2 published) ; median of 2 bids (1 published).
Published award notices, matched by object, trade and département. Click a name to open its record: where it wins, at what price, against how many.
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 10 décembre 2026, in 20 days.
- The contract is split into 9 lots. You may bid on the one that fits you only.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution), the contract duration, the estimated value. These are in the consultation rules inside the tender file.
cellule-marches@fbs50.fr +33 233218669
How many rivals you actually face
sur les marchés « Electricité (travaux) », la médiane est de 5 offres par lot. 29 % des lots en reçoivent trois ou moins, et seulement 9 % dépassent dix candidats.
85 % des offres viennent de PME.
Stakes: Enjeu observé : 639 681 € (médiane du métier, 175 marchés), 3 offres attendues (médiane du métier, 120 marchés) ; environ 213 227 € espérés, ordre de grandeur, pas un devis.
Measured on 116 awarded lots that publish their statistics. 56% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-112401.