Bâtiment & gros œuvre20d leftProcédure Ouverte

Installation et location de bâtiments modulaires à la Brigade de Surveillance Extérieure Conteneurs de Gonfreville l’Orcher

Buyer

DGDDI DI NORMANDIE

Location

Seine-Maritime

Deadline

15 sept. 2026

20d left
Published

15 août 2026

Open the notice & tender file ↗

The essentials, in thirty seconds

Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.

  • Questions to the buyer until 4 septembre 2026, i.e. 10 days.
  • Bids due on 15 septembre 2026, in 20 days.
  • A single lot: the contract is taken whole or not at all.
  • Duration: 2 months.
  • environmental criteria are scored. That is where a local firm earns points a large group does not.

The notice does not state : the score breakdown (l'avis ne publie pas de critères d'attribution), the estimated value. These are in the consultation rules inside the tender file.

Ask the buyer a question

immobilier-rouen@douane.finances.gouv.fr +33 9 70 27 38 93

Open the tender file

How many rivals you actually face

sur l'ensemble des marchés français, la médiane est de 3 offres par lot. 61 % des lots en reçoivent trois ou moins, et seulement 4 % dépassent dix candidats.

3bids per lot, median
21 %of lots get a single bidder
61 %of lots get 3 bidders or fewer

66 % des offres viennent de PME, et dans 18 % des lots aucune PME n'a candidaté.

Measured on 4835 awarded lots that publish their statistics. 54% of buyers do; the rest say nothing, either way.

Run your radar to see how well this contract fits you, and get the next ones automatically. Opisz moją działalność →

Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-80491.