Installation et location de bâtiments modulaires à la Brigade de Surveillance Extérieure Conteneurs de Gonfreville l’Orcher
DGDDI DI NORMANDIE
Seine-Maritime
15 Sept 2026
15 Aug 2026
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Questions to the buyer until 4 September 2026, i.e. 10 days.
- Bids due on 15 September 2026, in 20 days.
- A single lot: the contract is taken whole or not at all.
- Duration: 2 months.
- environmental criteria are scored. That is where a local firm earns points a large group does not.
The notice does not state : the score breakdown (l'avis ne publie pas de critères d'attribution), the estimated value. These are in the consultation rules inside the tender file.
immobilier-rouen@douane.finances.gouv.fr +33 9 70 27 38 93
How many rivals you actually face
across French public contracts, the median is 3 bids per lot; 61% of lots get three or fewer, and only 4% get more than ten.
66% of bids come from SMEs, and in 18% of lots no SME bid at all.
Measured on 4835 awarded lots that publish their statistics. 54% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-80491.