Travaux de construction d’un USLD de 108 lits sur le site de Bois-Guillaume
CHU ROUEN NORMANDIE
Seine-Maritime
25 sept. 2026
19 août 2026
The essentials, in thirty seconds
Read straight from the notice the buyer published. It is not the consultation rules, which may add requirements, but it is enough to decide without downloading the file.
- Bids due on 25 septembre 2026, in 31 days.
- The contract is split into 8 lots. You may bid on the one that fits you only.
- Duration: 6 months.
- social and environmental criteria are scored. That is where a local firm earns points a large group does not.
The notice does not state : the question deadline, the score breakdown (l'avis ne publie pas de critères d'attribution), the estimated value. These are in the consultation rules inside the tender file.
cellulemarches@chu-rouen.fr 0232888023
How many rivals you actually face
sur les marchés « Tous corps d'état », la médiane est de 4 offres par lot. 38 % des lots en reçoivent trois ou moins, et seulement 0 % dépassent dix candidats.
0 % des offres viennent de PME, et dans 100 % des lots aucune PME n'a candidaté.
Measured on 13 awarded lots that publish their statistics. 54% of buyers do; the rest say nothing, either way.
Données publiques officielles réutilisées sous licence ouverte, avec mention de la source et de la date. Reference 26-81377.